X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374142007000

Well Details

Well ID: 0374142007000
Loading map...
Location: 00/07-20-037-14W4/0
Location Alias: 00/07-20-37-14 W4M
Location Alias 2: 00/07-20-037-14 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 14
Section: 20
County/Municipality: County of Paintearth No. 18
Well Name: ACL ET 1L PROVOST 7-20-37-14
Operator Name: Karve Energy Inc.
License Number: 0122138
License Date: 1986-02-04
License Status: Abandoned
Spud Date: 1986-02-11
Final Drill Date: 1986-02-15
Well Total Depth: 986.00 m
Surface Hole Latitude: 52.193446
Surface Hole Longitude: -111.963390

For data sources see[1][2]

Well History

Date Event
1986-02-04 Obtained License
1986-02-12 Surface Casing Operation Performed
1986-02-15 Finished Drilling
1986-02-15 Well Mode changed to Drilled and Cased
1986-02-16 Production Casing Operation Performed
1986-02-16 Rig Released
1986-02-25 Perforation Treatment Performed - Open-Hole Completion
1986-03-01 Well Log Performed
1986-03-07 Well Log Performed
1986-03-08 Perforation Treatment Performed - Cement Squeeze
1986-03-09 Liner Casing Operation Performed
1986-03-14 Well Log Performed
1986-03-15 Perforation Treatment Performed - Jet Perforation
1986-03-15 Well Log Performed
1986-09-06 Perforation Treatment Performed - Fractured
1986-12-01 Well Began Production
1986-12-01 Well Fluid changed to Gas
1986-12-01 Well Mode changed to Flowing
2010-07-01 Well Fluid changed to Gas
2010-07-01 Well Mode changed to Suspended
2013-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-09-19 Plug Back Performed
2013-09-19 Well Fluid changed to Gas
2013-09-19 Well Mode changed to Abandoned Zone
2013-10-08 Well Abandoned
2013-10-08 Well Fluid changed to Gas
2013-10-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-25 Open Hole/Barefoot Completion 946.50 986.00 0
1986-03-08 Cement Squeeze 946.50 986.00 0
1986-03-15 Perforation 960.50 963.50 13
1986-09-06 Fracture 960.50 963.50 0
2013-09-19 Packing Device Capped w/Cement 949.00 957.00 0
2013-09-19 Packing Device Capped w/Cement 852.00 860.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 470 0.0 0.0 0.0
1987 3649 0.0 0.0 0.0
1988 8072 0.0 0.0 0.0
1989 7504 0.0 0.0 0.0
1990 6296 0.0 0.0 0.0
1991 8257 0.0 0.0 0.0
1992 8435 0.0 0.0 0.0
1993 8505 0.0 0.0 0.0
1994 8391 0.0 0.0 0.0
1995 8451 0.0 0.0 0.0
1996 8610 0.0 0.0 0.0
1997 8678 0.0 0.0 0.0
1998 8112 0.0 0.0 0.0
1999 6352 0.0 0.0 0.0
2000 495 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References