X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374142110000

Well Details

Well ID: 0374142110000
Loading map...
Location: 00/10-21-037-14W4/0
Location Alias: 00/10-21-37-14 W4M
Location Alias 2: 00/10-21-037-14 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 14
Section: 21
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 10-21-37-14
Operator Name: Karve Energy Inc.
License Number: 0030128
License Date: 1966-03-01
License Status: Suspension
Spud Date: 1966-03-12
Final Drill Date: 1966-03-20
Well Total Depth: 1126.50 m
Surface Hole Latitude: 52.195714
Surface Hole Longitude: -111.942419

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-03-01 Obtained License
1966-03-18 Drill Stem Test Performed
1966-03-20 Finished Drilling
1966-03-22 Drill Stem Test Performed
1966-03-23 Production Casing Operation Performed
1966-06-03 Perforation Treatment Performed - Jet Perforation
1966-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-06 Perforation Treatment Performed - Jet Perforation
1966-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-06-08 Perforation Treatment Performed - Jet Perforation
1966-06-09 Perforation Treatment Performed - Fractured
1966-08-13 Well Mode changed to Drilled and Cased
1969-11-15 Well Began Production
1969-11-15 Well Fluid changed to Gas
1969-11-15 Well Mode changed to Flowing
2011-04-01 Well Fluid changed to Gas
2011-04-01 Well Mode changed to Pumping
2019-10-01 Well Fluid changed to Gas
2019-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-06-03 Perforation 1088.40 1091.50 7
1966-06-08 Perforation 976.60 977.20 7
1966-06-09 Fracture 966.80 977.20 0
1966-06-04 Acid Treatment 1088.40 1091.50 0
1966-06-05 Packing Device Capped w/Cement 1085.10 1085.10 0
1966-06-06 Perforation 1070.20 1073.20 7
1966-06-06 Acid Treatment 1070.20 1073.20 0
1966-06-08 Packing Device Capped w/Cement 1054.60 1054.60 0
1966-06-08 Perforation 966.80 969.00 7
1966-06-08 Perforation 972.30 973.50 7
1966-06-08 Perforation 975.40 976.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 946 0.0 0.0 0.0
1970 8459 0.0 0.0 0.0
1971 7860 0.0 0.0 0.0
1972 8541 0.0 0.0 0.0
1973 7654 0.0 0.0 0.0
1974 7618 0.0 0.0 0.0
1975 7141 0.0 0.0 0.0
1976 7345 0.0 0.0 0.0
1977 7852 0.0 0.0 0.0
1978 6609 0.0 0.0 0.0
1979 6209 0.0 0.0 0.0
1980 4314 0.0 0.0 0.0
1981 5110 0.0 0.0 0.0
1982 3637 0.0 0.0 0.0
1984 7084 0.0 0.0 0.0
1985 8534 0.0 0.0 0.0
1986 6994 0.0 0.0 0.0
1987 5089 0.0 0.0 0.0
1988 6618 0.0 0.0 0.0
1989 5097 0.0 0.0 0.0
1990 7668 0.0 0.0 0.0
1991 8029 0.0 0.0 0.0
1992 8116 0.0 0.0 0.0
1993 8317 0.0 0.0 0.0
1994 8424 0.0 0.0 0.0
1995 8583 0.0 0.0 0.0
1996 7785 0.0 0.0 0.0
1997 8303 0.0 0.0 0.0
1998 8287 0.0 0.0 0.0
1999 8635 0.0 0.0 0.0
2000 8206 0.0 0.0 0.0
2001 7892 0.0 0.0 0.0
2002 8646 0.0 0.0 0.0
2003 8305 0.0 0.0 0.0
2004 8709 0.0 0.0 0.0
2005 8405 0.0 0.0 0.0
2006 8622 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8687 0.0 0.0 0.0
2009 8616 0.0 0.0 0.0
2010 8639 0.0 0.0 0.0
2011 8687 0.0 0.0 0.0
2012 7871 0.0 0.0 0.0
2013 7440 0.0 0.0 0.0
2014 8401 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 6641 0.0 0.0 0.0
2017 192 0.0 0.0 0.0
2018 168 0.0 0.0 0.0

For data sources see[5]

References