X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374142811000

Well Details

Well ID: 0374142811000
Loading map...
Location: 00/11-28-037-14W4/0
Location Alias: 00/11-28-37-14 W4M
Location Alias 2: 00/11-28-037-14 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 14
Section: 28
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 11-28-37-14
Operator Name: Karve Energy Inc.
License Number: 0078223
License Date: 1979-09-24
License Status: Suspension
Spud Date: 1979-11-21
Final Drill Date: 1979-11-26
Well Total Depth: 1126.00 m
Surface Hole Latitude: 52.211526
Surface Hole Longitude: -111.950222

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-24 Obtained License
1979-11-25 Drill Stem Test Performed
1979-11-26 Finished Drilling
1979-11-27 Drill Stem Test Performed
1979-11-28 Drill Stem Test Performed
1979-11-29 Production Casing Operation Performed
1979-12-20 Perforation Treatment Performed - Jet Perforation
1980-01-18 Well Mode changed to Drilled and Cased
1982-04-29 Well Began Production
1982-04-29 Well Fluid changed to Gas
1982-04-29 Well Mode changed to Flowing
1987-07-29 Perforation Treatment Performed - Jet Perforation
1987-07-29 Well Log Performed
1987-07-30 Perforation Treatment Performed - Fractured
1987-08-01 Well Fluid changed to Gas
1987-08-01 Well Mode changed to Flowing
1999-05-01 Well Fluid changed to Gas
1999-05-01 Well Mode changed to Flowing
2007-08-01 Well Fluid changed to Gas
2007-08-01 Well Mode changed to Pumping
2008-04-04 Perforation Treatment Performed - Chemical Squeeze
2011-07-01 Well Fluid changed to Gas
2011-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-20 Perforation 1099.70 1101.00 7
1987-07-29 Perforation 968.00 970.00 13
1987-07-29 Perforation 972.00 975.00 13
1987-07-29 Perforation 976.00 977.00 13
1987-07-30 Fracture 968.00 977.00 0
2008-04-04 Chemical Squeeze 968.00 1101.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 3781 0.0 0.0 0.0
1983 706 0.0 0.0 0.0
1984 7348 0.0 0.0 0.0
1985 8683 0.0 0.0 0.0
1986 8306 0.0 0.0 0.0
1987 6195 0.0 0.0 0.0
1988 7571 0.0 0.0 0.0
1989 8302 0.0 0.0 0.0
1990 8576 0.0 0.0 0.0
1991 8428 0.0 0.0 0.0
1992 8094 0.0 0.0 0.0
1993 8232 0.0 0.0 0.0
1994 8455 0.0 0.0 0.0
1995 8618 0.0 0.0 0.0
1996 8734 0.0 0.0 0.0
1997 8424 0.0 0.0 0.0
1998 8650 0.0 0.0 0.0
1999 8749 0.0 0.0 0.0
2000 8759 0.0 0.0 0.0
2001 7302 0.0 0.0 0.0
2002 8602 0.0 0.0 0.0
2003 8500 0.0 0.0 0.0
2004 8781 0.0 0.0 0.0
2005 744 0.0 0.0 0.0
2006 4537 0.0 0.0 0.0
2007 8544 0.0 0.0 0.0
2008 8257 0.0 0.0 0.0
2009 8328 0.0 0.0 0.0
2010 4919 0.0 0.0 0.0

For data sources see[5]

References