X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374183415000

Well Details

Well ID: 0374183415000
Loading map...
Location: 00/15-34-037-18W4/0
Location Alias: 00/15-34-37-18 W4M
Location Alias 2: 00/15-34-037-18 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 18
Section: 34
County/Municipality: County of Stettler No. 6
Well Name: RALLYCANADA MARION LEA 15-34-37-18
Operator Name: Rally Canada Resources Ltd.
License Number: 0153427
License Date: 1992-08-14
License Status: Amended
Spud Date: 1992-08-25
Final Drill Date: 1992-08-28
Well Total Depth: 1321.00 m
Surface Hole Latitude: 52.229437
Surface Hole Longitude: -112.490802

For data sources see[1][2]

Well History

Date Event
1992-08-14 Obtained License
1992-08-26 Surface Casing Operation Performed
1992-08-28 Finished Drilling
1992-08-28 Well Mode changed to Drilled and Cased
1992-08-29 Well Log Performed
1992-08-30 Production Casing Operation Performed
1992-08-30 Rig Released
1992-09-01 Perforation Treatment Performed - Jet Perforation
1992-09-12 Well Began Production
1992-09-12 Well Fluid changed to Crude Oil
1992-09-12 Well Mode changed to Pumping
1994-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-20 Perforation Treatment Performed - Cement Squeeze
1994-04-25 Perforation Treatment Performed - Jet Perforation
1994-04-25 Well Log Performed
1994-04-26 Well Log Performed
1994-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-28 Well Log Performed
1994-06-03 Well Began Injection
1994-06-03 Well Fluid changed to Water
1994-06-03 Well Type changed to Injection
1998-08-14 Perforation Treatment Performed - Chemical Squeeze
1998-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-10 Perforation Treatment Performed - Chemical Squeeze
2000-10-05 Perforation Treatment Performed - Chemical Squeeze
2003-09-14 Perforation Treatment Performed - Chemical Squeeze
2006-09-15 Perforation Treatment Performed - Chemical Squeeze
2008-02-29 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-09-01 Perforation 1274.00 1275.50 13
2000-10-05 Chemical Squeeze 1286.00 1298.00 0
2003-09-14 Chemical Squeeze 1286.00 1298.00 0
2006-09-15 Chemical Squeeze 1286.00 1298.00 0
2008-02-29 Acid Treatment 1286.00 1298.00 0
1992-09-01 Perforation 1278.00 1279.50 13
1994-04-20 Acid Treatment 1274.00 1279.50 0
1994-04-20 Cement Squeeze 1274.00 1279.50 0
1994-04-25 Perforation 1286.00 1298.00 19
1994-04-27 Acid Treatment 1286.00 1298.00 0
1998-08-14 Chemical Squeeze 1286.00 1298.00 0
1998-08-15 Acid Treatment 1286.00 1298.00 0
1999-09-10 Chemical Squeeze 1286.00 1298.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 2379 0.0 0.0 0.0
1993 7089 0.0 0.0 0.0
1994 2016 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

References