X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374200310020

Well Details

Well ID: 0374200310020
Loading map...
Location: 02/10-03-037-20W4/0
Location Alias: 02/10-03-37-20 W4M
Location Alias 2: 02/10-03-037-20 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 20
Section: 03
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH 102 FENNBV 10-3-37-20
Operator Name: Enhance Energy Inc.
License Number: 0110866
License Date: 1984-11-21
License Status: Suspension
Spud Date: 1984-12-04
Final Drill Date: 1984-12-14
Well Total Depth: 1670.00 m
Surface Hole Latitude: 52.151941
Surface Hole Longitude: -112.773936

For data sources see[1][2]

Well History

Date Event
1984-11-21 Obtained License
1984-12-05 Surface Casing Operation Performed
1984-12-06 Direction Drilling Operation Performed - Deviate
1984-12-08 Lost Circulation Occurred
1984-12-12 Lost Circulation Occurred
1984-12-14 Finished Drilling
1984-12-14 Well Log Performed
1984-12-14 Well Mode changed to Drilled and Cased
1984-12-15 Drill Stem Test Performed
1984-12-17 Production Casing Operation Performed
1984-12-17 Rig Released
1985-01-03 Well Log Performed
1985-01-15 Well Log Performed
1985-01-16 Perforation Treatment Performed - Jet Perforation
1985-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-18 Well Log Performed
1985-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-19 Perforation Treatment Performed - Jet Perforation
1985-03-06 Well Began Production
1985-03-06 Well Fluid changed to Crude Oil
1985-03-06 Well Mode changed to Pumping
1986-02-01 Well Fluid changed to Crude Oil
1986-02-01 Well Mode changed to Suspended
1988-01-23 Perforation Treatment Performed - Cement Squeeze
1988-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-01-27 Perforation Treatment Performed - Jet Perforation
1988-01-27 Plug Back Performed
1988-01-27 Well Fluid changed to Crude Oil
1988-01-27 Well Mode changed to Abandoned Zone
1988-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-25 Perforation Treatment Performed - Acid Wash - No Pressure
1990-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-17 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-12-06 183.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-01-16 Perforation 1645.00 1645.50 7
1990-10-17 Acid Treatment 1597.00 1598.50 0
2002-10-17 Packing Device Capped w/Cement 1592.00 1600.00 0
1985-01-17 Acid Treatment 1645.00 1645.50 0
1985-01-19 Perforation 1599.50 1601.00 13
1985-01-19 Acid Treatment 1599.50 1601.00 0
1988-01-23 Cement Squeeze 1599.50 1601.00 0
1988-01-27 Packing Device Capped w/Cement 1625.50 1640.00 0
1988-01-27 Perforation 1597.00 1598.50 13
1988-01-28 Acid Treatment 1597.00 1598.50 0
1990-01-25 Acid Wash 1597.00 1598.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 4983 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-12-08 Lost Circulation 1315.00 1315.00
1984-12-12 Lost Circulation 1599.00 1599.00

For data sources see[7]

References