X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374202208002

Well Details

Well ID: 0374202208002
Loading map...
Location: 00/08-22-037-20W4/2
Location Alias: 00/08-22-37-20 W4M
Location Alias 2: 00/08-22-037-20 W4/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 20
Section: 22
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 8-22-37-20
Operator Name: Enhance Energy Inc.
License Number: 0103150
License Date: 1983-09-16
License Status: Suspension
Spud Date: 1983-09-19
Final Drill Date: 1983-10-01
Well Total Depth: 1690.00 m
Surface Hole Latitude: 52.192676
Surface Hole Longitude: -112.771882

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-09-16 Obtained License
1983-10-01 Finished Drilling
1983-10-01 Well Mode changed to Drilled and Cased
1983-10-02 Drill Stem Test Performed
1983-10-04 Drill Stem Test Performed
1983-10-05 Drill Stem Test Performed
1983-10-06 Drill Stem Test Performed
1983-10-08 Production Casing Operation Performed
1983-11-10 Well Log Performed
1983-11-11 Perforation Treatment Performed - Jet Perforation
1983-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-09 Well Log Performed
1985-05-10 Perforation Treatment Performed - Cement Squeeze
1985-05-10 Perforation Treatment Performed - Jet Perforation
1985-05-13 Well Log Performed
1985-05-14 Perforation Treatment Performed - Jet Perforation
1985-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-17 Well Log Performed
1985-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-18 Perforation Treatment Performed - Jet Perforation
1985-06-06 Well Began Production
1985-06-06 Well Fluid changed to Crude Oil
1985-06-06 Well Mode changed to Pumping
1986-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-25 Perforation Treatment Performed - Cement Squeeze
1986-04-28 Perforation Treatment Performed - Jet Perforation
1986-04-28 Well Log Performed
1986-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-12-01 Well Fluid changed to Crude Oil
1988-12-01 Well Mode changed to Suspended
1990-09-08 Perforation Treatment Performed - Cement Plug
1990-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-18 Well Log Performed
1990-09-19 Perforation Treatment Performed - Selective Jet Perforations
1990-09-20 Perforation Treatment Performed - Selective Jet Perforations
1990-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-28 Well Fluid changed to Crude Oil
1990-09-28 Well Mode changed to Pumping
1991-01-16 Perforation Treatment Performed - Jet Perforation
1991-01-16 Well Log Performed
1991-01-22 Perforation Treatment Performed - Cement Squeeze
1999-12-01 Well Fluid changed to Crude Oil
1999-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-11-11 Perforation 1651.70 1652.70 13
1986-04-25 Cement Squeeze 1602.00 1605.00 0
1986-04-28 Perforation 1598.00 1601.00 12
1986-04-29 Acid Treatment 1598.00 1601.00 0
1990-09-08 Cement Plug 1652.30 1654.40 0
1990-09-11 Acid Treatment 1651.50 1653.00 0
1990-09-19 Selective Jet Perforations 1606.40 1606.40 0
1990-09-19 Selective Jet Perforations 1606.20 1606.20 0
1990-09-20 Selective Jet Perforations 1599.60 1600.00 0
1990-09-20 Selective Jet Perforations 1600.10 1600.40 0
1990-09-20 Selective Jet Perforations 1603.60 1604.20 0
1983-11-12 Acid Treatment 1651.70 1652.70 0
1990-09-20 Selective Jet Perforations 1604.60 1605.00 0
1990-09-20 Selective Jet Perforations 1605.40 1605.80 0
1990-09-20 Selective Jet Perforations 1606.20 1606.20 0
1990-09-21 Acid Treatment 1598.00 1606.40 0
1991-01-16 Perforation 1262.80 1265.80 16
1991-01-16 Perforation 1263.80 1266.80 16
1991-01-22 Cement Squeeze 1262.80 1266.80 0
1985-05-10 Perforation 1653.00 1656.00 7
1985-05-10 Cement Squeeze 1651.70 1656.00 0
1985-05-14 Perforation 1602.00 1605.00 13
1985-05-15 Acid Treatment 1602.00 1605.00 0
1985-05-18 Perforation 1651.50 1653.00 13
1985-05-18 Acid Treatment 1651.50 1653.00 0
1986-04-25 Acid Treatment 1602.00 1605.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 4905 0.0 0.0 0.0
1986 7627 0.0 0.0 0.0
1987 5814 0.0 0.0 0.0
1990 215 0.0 0.0 0.0

For data sources see[5]

References