If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0374210910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.16168,"lon":-112.940128,"icon":""}]} |
| Location: 00/10-09-037-21W4/0 | |
| Location Alias: 00/10-09-37-21 W4M | |
| Location Alias 2: 00/10-09-037-21 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 037 | |
| Meridian: 4 | |
| Range: 21 | |
| Section: 09 | |
| County/Municipality: County of Stettler No. 6 | |
| Well Name: EMBER EWINGLK 10-9-37-21 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0428538 | |
| License Date: 2010-12-21 | |
| License Status: Issued | |
| Spud Date: 2011-03-07 | |
| Final Drill Date: 2011-03-08 | |
| Well Total Depth: 1080.00 m | |
| Surface Hole Latitude: 52.161680 | |
| Surface Hole Longitude: -112.940128 |
| Date | Event |
|---|---|
| 2010-12-21 | Obtained License |
| 2011-03-07 | Direction Drilling Operation Performed - Deviate |
| 2011-03-07 | Surface Casing Operation Performed |
| 2011-03-08 | Finished Drilling |
| 2011-03-08 | Well Log Performed |
| 2011-03-08 | Well Mode changed to Drilled and Cased |
| 2011-03-09 | Production Casing Operation Performed |
| 2011-03-09 | Rig Released |
| 2011-03-22 | Perforation Treatment Performed - Jet Perforation |
| 2011-03-24 | Perforation Treatment Performed - Fractured |
| 2011-03-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-03-27 | Well Mode changed to Testing |
| 2011-10-06 | Well Began Production |
| 2011-10-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-10-06 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-03-07 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-03-22 | Perforation | 427.20 | 430.50 | 13 |
| 2011-03-22 | Perforation | 304.00 | 306.00 | 13 |
| 2011-03-22 | Perforation | 328.00 | 328.50 | 13 |
| 2011-03-22 | Perforation | 315.00 | 315.50 | 13 |
| 2011-03-22 | Perforation | 286.00 | 286.50 | 13 |
| 2011-03-22 | Perforation | 542.50 | 543.50 | 13 |
| 2011-03-22 | Perforation | 508.70 | 509.20 | 13 |
| 2011-03-22 | Perforation | 502.00 | 503.50 | 13 |
| 2011-03-22 | Perforation | 607.50 | 608.00 | 13 |
| 2011-03-22 | Perforation | 563.00 | 564.00 | 13 |
| 2011-03-22 | Perforation | 558.00 | 560.50 | 13 |
| 2011-03-22 | Perforation | 416.50 | 417.50 | 13 |
| 2011-03-22 | Perforation | 475.00 | 475.50 | 13 |
| 2011-03-22 | Perforation | 464.90 | 465.40 | 13 |
| 2011-03-22 | Perforation | 458.00 | 461.00 | 13 |
| 2011-03-22 | Perforation | 481.50 | 482.00 | 13 |
| 2011-03-22 | Perforation | 496.30 | 497.30 | 13 |
| 2011-03-22 | Perforation | 477.80 | 478.30 | 13 |
| 2011-03-24 | Fracture | 304.00 | 399.00 | 0 |
| 2011-03-24 | Fracture | 286.00 | 564.00 | 0 |
| 2011-03-24 | Fracture | 607.50 | 608.00 | 0 |
| 2011-03-22 | Perforation | 384.50 | 385.00 | 13 |
| 2011-03-22 | Perforation | 443.60 | 444.10 | 13 |
| 2011-03-22 | Perforation | 438.80 | 439.30 | 13 |
| 2011-03-22 | Perforation | 430.50 | 432.20 | 13 |
| 2011-03-22 | Perforation | 363.20 | 364.70 | 13 |
| 2011-03-22 | Perforation | 488.00 | 495.00 | 13 |
| 2011-03-22 | Perforation | 396.00 | 399.00 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 2098 | 0.0 | 0.0 | 0.0 |
| 2012 | 8632 | 0.0 | 0.0 | 0.0 |
| 2013 | 8685 | 0.0 | 0.0 | 0.0 |
| 2014 | 8678 | 0.0 | 0.0 | 0.0 |
| 2015 | 8689 | 0.0 | 0.0 | 0.0 |
| 2016 | 8704 | 0.0 | 0.0 | 0.0 |
| 2017 | 8695 | 0.0 | 0.0 | 0.0 |
| 2018 | 8704 | 0.0 | 0.0 | 0.0 |
| 2019 | 8725 | 0.0 | 0.0 | 0.0 |
| 2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[6]