X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374252603000

Well Details

Well ID: 0374252603000
Loading map...
Location: 00/03-26-037-25W4/0
Location Alias: 00/03-26-37-25 W4M
Location Alias 2: 00/03-26-037-25 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 25
Section: 26
County/Municipality: Red Deer County
Well Name: AMOCO HILLSDOWN 3-26-37-25
Operator Name: Plains Midstream Canada ULC
License Number: 0021846
License Date: 1961-12-18
License Status: Re-Entered
Spud Date: 1962-01-08
Final Drill Date: 1962-02-05
Well Total Depth: 2025.40 m
Surface Hole Latitude: 52.202754
Surface Hole Longitude: -113.471959

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-12-18 Obtained License
1962-02-04 Drill Stem Test Performed
1962-02-05 Finished Drilling
1962-02-05 Production Casing Operation Performed
1962-02-05 Well Mode changed to Drilled and Cased
1962-02-07 Drill Stem Test Performed
1962-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-02-10 Perforation Treatment Performed - Acid Wash - No Pressure
1962-02-10 Perforation Treatment Performed - Jet Perforation
1962-02-17 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-02-17 Perforation Treatment Performed - Cement Squeeze
1962-02-22 Perforation Treatment Performed - Jet Perforation
1962-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-02-24 Perforation Treatment Performed - Acid Wash - No Pressure
1962-02-24 Perforation Treatment Performed - Jet Perforation
1962-03-02 Well Began Production
1962-03-02 Well Fluid changed to Crude Oil
1962-03-02 Well Mode changed to Flowing
1964-06-26 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-06-26 Perforation Treatment Performed - Condensate Squeeze
1964-08-15 Perforation Treatment Performed - Cement Squeeze
1964-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-19 Perforation Treatment Performed - Acid Wash - No Pressure
1964-08-19 Perforation Treatment Performed - Jet Perforation
1964-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-06-30 Well Fluid changed to Crude Oil
1965-06-30 Well Mode changed to Suspended
1965-09-19 Perforation Treatment Performed - Cement Squeeze
1965-09-23 Perforation Treatment Performed - Jet Perforation
1965-09-24 Perforation Treatment Performed - Acid Wash - No Pressure
1970-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1970-06-05 Well Abandoned
1970-06-05 Well Fluid changed to Crude Oil
1970-06-05 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-02-10 Perforation 1997.70 1999.80 7
1962-02-24 Acid Treatment 1981.80 1991.60 0
1964-06-26 Condensate Squeeze 1981.80 1991.60 0
1964-06-26 Hydra Jet Perforation 1993.40 1993.40 0
1964-08-15 Cement Squeeze 1981.80 1991.60 0
1964-08-19 Perforation 1987.30 1988.80 13
1964-08-19 Acid Wash 1987.30 1993.40 0
1964-08-19 Acid Treatment 1987.30 1993.40 0
1964-08-28 Acid Treatment 1987.30 1993.40 0
1964-10-27 Acid Treatment 1987.30 1988.80 0
1965-09-19 Cement Squeeze 1987.30 1993.40 0
1962-02-10 Acid Wash 1997.70 1999.80 0
1965-09-23 Perforation 1986.70 1987.90 0
1965-09-24 Acid Wash 1986.70 1987.90 0
1970-06-04 Packing Device Capped w/Cement 1961.40 1961.40 0
1962-02-10 Acid Treatment 1997.70 1999.80 0
1962-02-17 Hydra Jet Perforation 1981.80 1981.80 0
1962-02-17 Acid Treatment 1997.70 1999.80 0
1962-02-17 Cement Squeeze 1997.70 1999.80 0
1962-02-22 Perforation 1990.30 1991.60 7
1962-02-24 Perforation 1987.00 1989.10 7
1962-02-24 Acid Wash 1981.80 1991.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0

For data sources see[5]

References