If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0374252609002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.212176,"lon":-113.461968,"icon":""}]} |
| Location: 00/09-26-037-25W4/2 | |
| Location Alias: 00/09-26-37-25 W4M | |
| Location Alias 2: 00/09-26-037-25 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 037 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 26 | |
| County/Municipality: Red Deer County | |
| Well Name: CPC RESOURCES THREEHCK 9-26-37-25 | |
| Operator Name: Lynx Energy ULC | |
| License Number: 0365188 | |
| License Date: 2006-10-30 | |
| License Status: Issued | |
| Spud Date: 2006-12-07 | |
| Final Drill Date: 2006-12-12 | |
| Well Total Depth: 930.00 m | |
| Surface Hole Latitude: 52.212176 | |
| Surface Hole Longitude: -113.461968 |
| Date | Event |
|---|---|
| 2006-10-30 | Obtained License |
| 2006-12-07 | Lost Circulation Occurred |
| 2006-12-10 | Surface Casing Operation Performed |
| 2006-12-12 | Finished Drilling |
| 2006-12-12 | Well Log Performed |
| 2006-12-12 | Well Mode changed to Drilled and Cased |
| 2006-12-14 | Production Casing Operation Performed |
| 2006-12-14 | Rig Released |
| 2007-10-16 | Perforation Treatment Performed - Jet Perforation |
| 2007-11-07 | Perforation Treatment Performed - Fractured |
| 2007-11-19 | Perforation Treatment Performed - Jet Perforation |
| 2007-11-23 | Perforation Treatment Performed - Fractured |
| 2008-03-06 | Well Began Production |
| 2008-03-06 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2008-03-06 | Well Mode changed to Flowing |
| 2008-07-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2008-07-20 | Well Mode changed to Flowing |
| 2010-05-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-05-24 | Well Mode changed to Suspended |
| 2010-05-25 | Perforation Treatment Performed - Jet Perforation |
| 2010-05-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-05-25 | Well Mode changed to Flowing |
| 2010-09-05 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2007-10-16 | Perforation | 873.00 | 874.50 | 17 |
| 2007-11-19 | Perforation | 548.50 | 549.50 | 13 |
| 2007-11-19 | Perforation | 557.50 | 558.50 | 13 |
| 2007-11-19 | Perforation | 562.00 | 562.50 | 13 |
| 2007-11-19 | Perforation | 572.00 | 573.50 | 13 |
| 2007-11-19 | Perforation | 575.00 | 576.00 | 13 |
| 2007-11-23 | Fracture | 461.00 | 576.00 | 0 |
| 2010-05-25 | Perforation | 539.50 | 540.00 | 13 |
| 2010-05-25 | Perforation | 535.80 | 536.80 | 13 |
| 2010-05-25 | Perforation | 447.00 | 449.00 | 13 |
| 2010-05-25 | Perforation | 439.00 | 439.50 | 13 |
| 2007-11-07 | Fracture | 873.00 | 874.50 | 0 |
| 2010-05-25 | Perforation | 376.80 | 377.80 | 13 |
| 2010-05-25 | Perforation | 349.50 | 350.50 | 13 |
| 2010-05-25 | Perforation | 314.00 | 314.50 | 13 |
| 2010-05-25 | Perforation | 226.00 | 227.00 | 13 |
| 2010-05-25 | Perforation | 223.00 | 224.00 | 13 |
| 2010-05-25 | Perforation | 218.00 | 218.50 | 13 |
| 2010-09-05 | Fracture | 218.00 | 576.00 | 0 |
| 2007-11-19 | Perforation | 461.00 | 462.00 | 13 |
| 2007-11-19 | Perforation | 466.50 | 467.50 | 13 |
| 2007-11-19 | Perforation | 495.00 | 495.50 | 13 |
| 2007-11-19 | Perforation | 506.00 | 507.00 | 13 |
| 2007-11-19 | Perforation | 517.00 | 518.00 | 13 |
| 2007-11-19 | Perforation | 523.00 | 524.00 | 13 |
| 2007-11-19 | Perforation | 528.00 | 528.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2008 | 6715 | 0.0 | 0.0 | 0.0 |
| 2009 | 4924 | 0.0 | 0.0 | 0.0 |
| 2010 | 8275 | 0.0 | 0.0 | 0.0 |
| 2011 | 8327 | 0.0 | 0.0 | 0.0 |
| 2012 | 8633 | 0.0 | 0.0 | 0.0 |
| 2013 | 8250 | 0.0 | 0.0 | 0.0 |
| 2014 | 8265 | 0.0 | 0.0 | 0.0 |
| 2015 | 8412 | 0.0 | 0.0 | 0.0 |
| 2016 | 8576 | 0.0 | 0.0 | 0.0 |
| 2017 | 8282 | 0.0 | 0.0 | 0.0 |
| 2018 | 8351 | 0.0 | 0.0 | 0.0 |
| 2019 | 8666 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2006-12-07 | Lost Circulation | 73.00 | 104.50 |
For data sources see[6]