X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374260308020

Well Details

Well ID: 0374260308020
Loading map...
Location: 02/08-03-037-26W4/0
Location Alias: 02/08-03-37-26 W4M
Location Alias 2: 02/08-03-037-26 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 26
Section: 03
County/Municipality: Red Deer County
Well Name: CPC RESOURCES JOFFRE 8-3-37-26
Operator Name: Lynx Energy ULC
License Number: 0321955
License Date: 2004-12-16
License Status: Issued
Spud Date: 2005-02-14
Final Drill Date: 2005-02-15
Well Total Depth: 798.00 m
Surface Hole Latitude: 52.147290
Surface Hole Longitude: -113.627475

For data sources see[1][2]

Well History

Date Event
2004-12-16 Obtained License
2005-02-07 Well Log Performed
2005-02-14 Surface Casing Operation Performed
2005-02-15 Finished Drilling
2005-02-15 Production Casing Operation Performed
2005-02-15 Rig Released
2005-02-15 Well Mode changed to Drilled and Cased
2005-02-23 Well Log Performed
2005-05-13 Perforation Treatment Performed - Jet Perforation
2005-05-22 Well Fluid changed to Coalbed Methane-Coals and Other
2005-05-22 Well Mode changed to Testing
2005-06-09 Well Began Production
2005-06-09 Well Fluid changed to Coalbed Methane-Coals and Other
2005-06-09 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-05-13 Perforation 721.60 722.60 13
2005-05-13 Perforation 645.50 646.50 13
2005-05-13 Perforation 630.60 631.60 13
2005-05-13 Perforation 626.90 627.90 13
2005-05-13 Perforation 590.30 591.30 13
2005-05-13 Perforation 577.80 578.80 13
2005-05-13 Perforation 573.00 574.00 13
2005-05-13 Perforation 571.00 572.00 13
2005-05-13 Perforation 573.00 574.00 13
2005-05-13 Perforation 566.70 567.70 13
2005-05-13 Perforation 563.50 564.50 13
2005-05-13 Perforation 716.80 717.80 13
2005-05-13 Perforation 535.00 536.00 13
2005-05-13 Perforation 535.00 536.00 13
2005-05-13 Perforation 508.50 509.50 13
2005-05-13 Perforation 496.00 497.00 13
2005-05-13 Perforation 425.50 427.50 13
2005-05-13 Perforation 344.80 345.80 13
2005-05-13 Perforation 337.50 338.50 13
2005-05-13 Perforation 332.80 334.80 13
2005-05-13 Perforation 243.00 245.00 13
2005-05-13 Perforation 238.50 239.50 13
2005-05-13 Perforation 709.90 710.90 13
2005-05-13 Perforation 221.50 222.50 13
2005-05-13 Perforation 703.50 706.50 13
2005-05-13 Perforation 693.60 695.60 13
2005-05-13 Perforation 681.00 682.00 13
2005-05-13 Perforation 668.50 671.50 13
2005-05-13 Perforation 655.00 656.00 13
2005-05-13 Perforation 650.50 651.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 5049 0.0 0.0 0.0
2006 8748 0.0 0.0 0.0
2007 8727 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8660 0.0 0.0 0.0
2010 8710 0.0 0.0 0.0
2011 8638 0.0 0.0 0.0
2012 8758 0.0 0.0 0.0
2013 8726 0.0 0.0 0.0
2014 8632 0.0 0.0 0.0
2015 8743 0.0 0.0 0.0
2016 8772 0.0 0.0 0.0
2017 8728 0.0 0.0 0.0
2018 8723 0.0 0.0 0.0
2019 8754 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References