X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374260908002

Well Details

Well ID: 0374260908002
Loading map...
Location: 00/08-09-037-26W4/2
Location Alias: 00/08-09-37-26 W4M
Location Alias 2: 00/08-09-037-26 W4/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 26
Section: 09
County/Municipality: Red Deer County
Well Name: CNRL JOFFRE 8-9-37-26
Operator Name: Canadian Natural Resources Limited
License Number: 0184586
License Date: 1996-01-15
License Status: Issued
Spud Date: 1996-01-20
Final Drill Date: 1996-01-30
Well Total Depth: 1890.00 m
Surface Hole Latitude: 52.164436
Surface Hole Longitude: -113.647947

For data sources see[1][2]

Well History

Date Event
1996-01-15 Obtained License
1996-01-20 Well Log Performed
1996-01-22 Surface Casing Operation Performed
1996-01-24 Direction Drilling Operation Performed - Deviate
1996-01-30 Finished Drilling
1996-01-30 Well Log Performed
1996-01-30 Well Mode changed to Drilled and Cased
1996-01-31 Well Log Performed
1996-02-01 Drill Stem Test Performed
1996-02-02 Drill Stem Test Performed
1996-02-05 Production Casing Operation Performed
1996-02-05 Rig Released
1996-02-09 Well Log Performed
1996-02-10 Perforation Treatment Performed - Jet Perforation
1996-02-13 Perforation Treatment Performed - Fractured
1996-02-18 Well Log Performed
1996-02-19 Perforation Treatment Performed - Jet Perforation
1996-02-21 Perforation Treatment Performed - Fractured
1996-02-21 Well Log Performed
1996-10-30 Well Log Performed
1996-10-31 Perforation Treatment Performed - Jet Perforation
1996-11-01 Perforation Treatment Performed - Fractured
1996-11-06 Well Log Performed
1996-12-03 Well Began Production
1996-12-03 Well Fluid changed to Crude Oil
1996-12-03 Well Mode changed to Pumping
1997-06-01 Well Log Performed
2001-08-01 Well Fluid changed to Crude Oil
2001-08-01 Well Mode changed to Suspended
2016-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-07-26 Plug Back Performed
2016-07-26 Well Log Performed
2016-07-27 Perforation Treatment Performed - Cement Squeeze
2016-07-31 Perforation Treatment Performed - Jet Perforation
2016-07-31 Well Log Performed
2016-08-03 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-01-24 1210.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-02-10 Perforation 1844.00 1846.00 18
2016-07-31 Perforation 1626.50 1629.50 17
2016-08-03 Fracture 1626.50 1629.50 0
1996-02-13 Fracture 1844.00 1846.00 0
1996-02-19 Perforation 1626.50 1629.50 18
1996-02-21 Fracture 1626.50 1629.50 0
1996-10-31 Perforation 1616.50 1618.30 14
1996-10-31 Perforation 1620.50 1622.00 14
1996-11-01 Fracture 1616.50 1622.00 0
2016-07-26 Packing Device Capped w/Cement 1823.00 1831.00 0
2016-07-27 Cement Squeeze 1616.50 1622.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 590 0.0 0.0 0.0
1997 7450 0.0 0.0 0.0
1998 4509 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-08-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References