If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0374262808000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.207364,"lon":-113.647897,"icon":""}]} |
| Location: 00/08-28-037-26W4/0 | |
| Location Alias: 00/08-28-37-26 W4M | |
| Location Alias 2: 00/08-28-037-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 037 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 28 | |
| County/Municipality: Red Deer County | |
| Well Name: CPC RESOURCES JOFFRE 8-28-37-26 | |
| Operator Name: Lynx Energy ULC | |
| License Number: 0363551 | |
| License Date: 2006-09-25 | |
| License Status: Issued | |
| Spud Date: 2006-10-07 | |
| Final Drill Date: 2006-10-09 | |
| Well Total Depth: 1050.00 m | |
| Surface Hole Latitude: 52.207364 | |
| Surface Hole Longitude: -113.647897 |
| Date | Event |
|---|---|
| 2006-09-25 | Obtained License |
| 2006-10-08 | Surface Casing Operation Performed |
| 2006-10-09 | Finished Drilling |
| 2006-10-09 | Production Casing Operation Performed |
| 2006-10-09 | Rig Released |
| 2006-10-09 | Well Mode changed to Drilled and Cased |
| 2006-10-26 | Well Log Performed |
| 2007-07-01 | Perforation Treatment Performed - Jet Perforation |
| 2007-07-03 | Perforation Treatment Performed - Fractured |
| 2007-07-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2007-07-04 | Well Mode changed to Testing |
| 2008-11-01 | Well Began Production |
| 2008-11-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2008-11-01 | Well Mode changed to Flowing |
| 2011-03-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-03-23 | Plug Back Performed |
| 2011-03-23 | Well Log Performed |
| 2012-05-31 | Well Log Performed |
| 2019-05-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2019-05-07 | Well Mode changed to Suspended |
| 2019-10-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2019-10-16 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2007-07-01 | Perforation | 994.00 | 996.00 | 7 |
| 2007-07-01 | Perforation | 333.50 | 336.00 | 7 |
| 2007-07-01 | Perforation | 342.20 | 343.20 | 7 |
| 2007-07-01 | Perforation | 345.10 | 346.10 | 7 |
| 2007-07-01 | Perforation | 352.60 | 353.60 | 7 |
| 2007-07-01 | Perforation | 450.40 | 451.40 | 7 |
| 2007-07-01 | Perforation | 458.60 | 459.60 | 7 |
| 2007-07-01 | Perforation | 476.30 | 477.30 | 7 |
| 2007-07-01 | Perforation | 503.70 | 504.70 | 7 |
| 2007-07-01 | Perforation | 520.60 | 521.60 | 7 |
| 2007-07-01 | Perforation | 546.10 | 547.10 | 7 |
| 2007-07-01 | Perforation | 242.70 | 243.70 | 7 |
| 2007-07-01 | Perforation | 560.80 | 561.80 | 7 |
| 2007-07-01 | Perforation | 566.60 | 568.10 | 7 |
| 2007-07-01 | Perforation | 577.50 | 578.50 | 7 |
| 2007-07-01 | Perforation | 618.40 | 619.40 | 7 |
| 2007-07-01 | Perforation | 645.20 | 646.20 | 7 |
| 2007-07-01 | Perforation | 652.40 | 654.40 | 7 |
| 2007-07-01 | Perforation | 656.10 | 657.10 | 7 |
| 2007-07-01 | Perforation | 666.80 | 667.80 | 7 |
| 2007-07-01 | Perforation | 679.20 | 680.20 | 7 |
| 2007-07-01 | Perforation | 687.90 | 689.40 | 7 |
| 2007-07-01 | Perforation | 249.10 | 250.60 | 7 |
| 2007-07-01 | Perforation | 698.40 | 700.40 | 7 |
| 2007-07-01 | Perforation | 701.50 | 702.50 | 7 |
| 2007-07-01 | Perforation | 708.90 | 709.90 | 7 |
| 2007-07-01 | Perforation | 720.60 | 721.60 | 7 |
| 2007-07-01 | Perforation | 726.80 | 728.80 | 7 |
| 2007-07-01 | Perforation | 731.80 | 732.80 | 7 |
| 2007-07-03 | Fracture | 242.70 | 732.80 | 0 |
| 2011-03-23 | Packing Device Capped w/Cement | 982.00 | 990.00 | 0 |
| 2007-07-01 | Perforation | 253.00 | 254.00 | 7 |
| 2007-07-01 | Perforation | 254.60 | 256.60 | 7 |
| 2007-07-01 | Perforation | 257.20 | 260.20 | 7 |
| 2007-07-01 | Perforation | 261.40 | 262.40 | 7 |
| 2007-07-01 | Perforation | 268.40 | 269.40 | 7 |
| 2007-07-01 | Perforation | 330.20 | 331.20 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2007 | 120 | 0.0 | 0.0 | 0.0 |
| 2008 | 1443 | 0.0 | 0.0 | 0.0 |
| 2009 | 8669 | 0.0 | 0.0 | 0.0 |
| 2010 | 8732 | 0.0 | 0.0 | 0.0 |
| 2011 | 8412 | 0.0 | 0.0 | 0.0 |
| 2012 | 8532 | 0.0 | 0.0 | 0.0 |
| 2013 | 8723 | 0.0 | 0.0 | 0.0 |
| 2014 | 8675 | 0.0 | 0.0 | 0.0 |
| 2015 | 8728 | 0.0 | 0.0 | 0.0 |
| 2016 | 8760 | 0.0 | 0.0 | 0.0 |
| 2017 | 8747 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 4607 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]