X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375013006000

Well Details

Well ID: 0375013006000
Loading map...
Location: 00/06-30-037-01W5/0
Location Alias: 00/06-30-37-01 W5M
Location Alias 2: 00/06-30-037-01 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 01
Section: 30
County/Municipality: Red Deer County
Well Name: RESMAN ET AL SYLVAN LAKE 6-30-37-1
Operator Name: Resman Holdings Ltd.
License Number: 0118332
License Date: 1985-10-11
License Status: RecCertified
Spud Date: 1985-10-13
Final Drill Date: 1985-10-22
Well Total Depth: 1960.00 m
Surface Hole Latitude: 52.209457
Surface Hole Longitude: -114.137969

For data sources see[1][2]

Well History

Date Event
1985-10-11 Obtained License
1985-10-14 Surface Casing Operation Performed
1985-10-22 Finished Drilling
1985-10-22 Well Mode changed to Drilled and Cased
1985-10-23 Well Log Performed
1985-10-24 Production Casing Operation Performed
1985-10-24 Rig Released
1985-11-06 Perforation Treatment Performed - Jet Perforation
1985-11-06 Well Log Performed
1985-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-09 Perforation Treatment Performed - Fractured
1985-12-12 Well Began Production
1985-12-12 Well Fluid changed to Crude Oil
1985-12-12 Well Mode changed to Pumping
1988-02-01 Well Fluid changed to Crude Oil
1988-02-01 Well Mode changed to Suspended
1988-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-10-01 Plug Back Performed
1988-10-01 Well Abandoned
1988-10-01 Well Fluid changed to Crude Oil
1988-10-01 Well Log Performed
1988-10-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-06 Perforation 1910.00 1914.00 7
1985-11-06 Perforation 1907.00 1908.50 7
1985-11-06 Perforation 1903.50 1904.50 7
1985-11-06 Perforation 1900.00 1901.00 7
1985-11-08 Acid Treatment 1900.00 1914.00 0
1985-11-09 Fracture 1900.00 1914.00 0
1988-10-01 Packing Device Capped w/Cement 1877.00 1885.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1047 0.0 0.0 0.0
1986 5466 0.0 0.0 0.0
1987 1 0.0 0.0 0.0

For data sources see[5]

References