X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375013516020

Well Details

Well ID: 0375013516020
Loading map...
Location: 02/16-35-037-01W5/0
Location Alias: 02/16-35-37-01 W5M
Location Alias 2: 02/16-35-037-01 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 01
Section: 35
County/Municipality: Red Deer County
Well Name: UNIFIED TINDASTOLL 16-35-37-1
Operator Name: Unified Petroleums Ltd.
License Number: 0120570
License Date: 1985-12-20
License Status: RecCertified
Spud Date: 1986-01-23
Final Drill Date: 1986-02-03
Well Total Depth: 2050.00 m
Surface Hole Latitude: 52.231222
Surface Hole Longitude: -114.030844

For data sources see[1][2]

Well History

Date Event
1985-12-20 Obtained License
1986-01-25 Surface Casing Operation Performed
1986-02-03 Finished Drilling
1986-02-04 Well Log Performed
1986-02-06 Lost Circulation Occurred
1986-02-06 Production Casing Operation Performed
1986-02-06 Rig Released
1986-02-06 Well Mode changed to Drilled and Cased
1986-02-11 Perforation Treatment Performed - Jet Perforation
1986-02-18 Perforation Treatment Performed - Jet Perforation
1986-02-20 Perforation Treatment Performed - Fractured
1987-01-01 Well Began Production
1987-01-01 Well Fluid changed to Crude Oil
1987-01-01 Well Mode changed to Flowing
1987-03-20 Perforation Treatment Performed - Jet Perforation
1987-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-05 Perforation Treatment Performed - Fractured
1987-09-06 Perforation Treatment Performed - Jet Perforation
1987-09-06 Well Fluid changed to Crude Oil
1987-09-06 Well Mode changed to Flowing
1987-09-12 Perforation Treatment Performed - Fractured
1988-06-01 Well Fluid changed to Crude Oil
1988-06-01 Well Mode changed to Suspended
1996-06-26 Well Fluid changed to Crude Oil
1996-06-26 Well Mode changed to Closed
1996-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-30 Perforation Treatment Performed - Jet Perforation
1996-11-30 Plug Back Performed
1996-12-02 Perforation Treatment Performed - Remedial Casing
1996-12-02 Well Abandoned
1996-12-02 Well Fluid changed to Crude Oil
1996-12-02 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-11 Perforation 1998.20 2000.20 13
1996-11-30 Perforation 375.00 376.00 14
1996-12-02 Remedial Casing Cementing 375.00 376.00 0
1986-02-18 Perforation 1995.00 1997.00 13
1986-02-20 Fracture 1995.00 2000.20 0
1987-03-20 Perforation 1974.80 1976.20 13
1987-03-24 Acid Treatment 1974.80 1976.20 0
1987-06-05 Fracture 1974.80 1976.20 0
1987-09-06 Perforation 1942.70 1944.70 13
1987-09-12 Fracture 1942.70 1944.70 0
1996-11-30 Packing Device Capped w/Cement 1919.00 1927.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 36 0.0 0.0 0.0
1988 102 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-02-06 Lost Circulation 2050.00 2050.00

For data sources see[6]

References