If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0375021215000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.170299,"lon":-114.152493,"icon":""}]} |
| Location: 00/15-12-037-02W5/0 | |
| Location Alias: 00/15-12-37-02 W5M | |
| Location Alias 2: 00/15-12-037-02 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 037 | |
| Meridian: 5 | |
| Range: 02 | |
| Section: 12 | |
| County/Municipality: Red Deer County | |
| Well Name: CNGL SYLAKE 15-12-37-2 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0250121 | |
| License Date: 2001-01-30 | |
| License Status: Issued | |
| Spud Date: 2001-03-07 | |
| Final Drill Date: 2001-03-18 | |
| Well Total Depth: 2162.00 m | |
| Surface Hole Latitude: 52.170299 | |
| Surface Hole Longitude: -114.152493 |
| Date | Event |
|---|---|
| 2001-01-30 | Obtained License |
| 2001-03-10 | Surface Casing Operation Performed |
| 2001-03-18 | Finished Drilling |
| 2001-03-19 | Drill Stem Test Performed |
| 2001-03-19 | Well Log Performed |
| 2001-03-21 | Production Casing Operation Performed |
| 2001-03-21 | Rig Released |
| 2001-03-21 | Well Mode changed to Drilled and Cased |
| 2001-03-24 | Well Log Performed |
| 2001-03-25 | Perforation Treatment Performed - Cement Squeeze |
| 2001-03-25 | Perforation Treatment Performed - Jet Perforation |
| 2001-03-25 | Well Log Performed |
| 2001-03-27 | Perforation Treatment Performed - Cement Squeeze |
| 2001-03-27 | Perforation Treatment Performed - Jet Perforation |
| 2001-03-27 | Well Log Performed |
| 2001-03-28 | Perforation Treatment Performed - Jet Perforation |
| 2001-03-28 | Well Log Performed |
| 2001-03-29 | Perforation Treatment Performed - Cement Squeeze |
| 2001-03-30 | Perforation Treatment Performed - Jet Perforation |
| 2001-03-30 | Well Log Performed |
| 2001-03-31 | Well Log Performed |
| 2001-04-01 | Perforation Treatment Performed - Cement Squeeze |
| 2001-04-08 | Well Log Performed |
| 2001-04-10 | Perforation Treatment Performed - Jet Perforation |
| 2001-04-10 | Well Log Performed |
| 2001-04-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2001-04-15 | Well Log Performed |
| 2001-04-20 | Perforation Treatment Performed - Jet Perforation |
| 2001-04-20 | Well Log Performed |
| 2001-04-22 | Perforation Treatment Performed - Fractured |
| 2001-04-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-04-28 | Plug Back Performed |
| 2001-04-28 | Well Log Performed |
| 2001-05-10 | Perforation Treatment Performed - Chemical Squeeze |
| 2001-05-12 | Perforation Treatment Performed - Jet Perforation |
| 2001-05-12 | Well Log Performed |
| 2001-05-14 | Perforation Treatment Performed - Fractured |
| 2001-05-23 | Well Began Production |
| 2001-05-23 | Well Fluid changed to Gas |
| 2001-05-23 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2001-03-25 | Perforation | 669.00 | 670.00 | 14 |
| 2001-04-10 | Perforation | 2091.00 | 2093.00 | 17 |
| 2001-04-10 | Perforation | 2097.00 | 2099.00 | 17 |
| 2001-04-10 | Perforation | 2103.00 | 2104.00 | 17 |
| 2001-04-12 | Acid Treatment | 2082.50 | 2088.00 | 0 |
| 2001-04-12 | Acid Treatment | 2091.00 | 2093.00 | 0 |
| 2001-04-12 | Acid Treatment | 2097.00 | 2099.00 | 0 |
| 2001-04-12 | Acid Treatment | 2103.00 | 2104.00 | 0 |
| 2001-04-20 | Perforation | 2041.00 | 2043.00 | 17 |
| 2001-04-22 | Fracture | 2082.50 | 2088.00 | 0 |
| 2001-04-22 | Fracture | 2091.00 | 2093.00 | 0 |
| 2001-03-25 | Cement Squeeze | 669.00 | 670.00 | 0 |
| 2001-04-22 | Fracture | 2097.00 | 2099.00 | 0 |
| 2001-04-22 | Fracture | 2103.00 | 2104.00 | 0 |
| 2001-04-22 | Fracture | 2041.00 | 2043.00 | 0 |
| 2001-04-28 | Packing Device Capped w/Cement | 2071.50 | 2079.50 | 0 |
| 2001-05-10 | Chemical Squeeze | 2041.00 | 2043.00 | 0 |
| 2001-05-12 | Perforation | 788.00 | 792.00 | 17 |
| 2001-05-14 | Fracture | 788.00 | 792.00 | 0 |
| 2001-03-27 | Perforation | 599.00 | 600.00 | 14 |
| 2001-03-27 | Cement Squeeze | 599.00 | 600.00 | 0 |
| 2001-03-28 | Perforation | 433.00 | 434.00 | 14 |
| 2001-03-29 | Cement Squeeze | 433.00 | 434.00 | 0 |
| 2001-03-30 | Perforation | 310.00 | 311.00 | 17 |
| 2001-04-01 | Cement Squeeze | 310.00 | 311.00 | 0 |
| 2001-04-10 | Perforation | 2082.50 | 2088.00 | 17 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2001 | 5165 | 0.0 | 0.0 | 0.0 |
| 2002 | 8468 | 0.0 | 0.0 | 0.0 |
| 2003 | 8644 | 0.0 | 0.0 | 0.0 |
| 2004 | 8705 | 0.0 | 0.0 | 0.0 |
| 2005 | 7804 | 0.0 | 0.0 | 0.0 |
| 2006 | 8752 | 0.0 | 0.0 | 0.0 |
| 2007 | 8759 | 0.0 | 0.0 | 0.0 |
| 2008 | 8782 | 0.0 | 0.0 | 0.0 |
| 2009 | 8758 | 0.0 | 0.0 | 0.0 |
| 2010 | 8686 | 0.0 | 0.0 | 0.0 |
| 2011 | 8759 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8759 | 0.0 | 0.0 | 0.0 |
| 2015 | 8629 | 0.0 | 0.0 | 0.0 |
| 2016 | 8759 | 0.0 | 0.0 | 0.0 |
| 2017 | 8263 | 0.0 | 0.0 | 0.0 |
| 2018 | 7978 | 0.0 | 0.0 | 0.0 |
| 2019 | 894 | 0.0 | 0.0 | 0.0 |
For data sources see[5]