X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375030214000

Well Details

Well ID: 0375030214000
Loading map...
Location: 00/14-02-037-03W5/0
Location Alias: 00/14-02-37-03 W5M
Location Alias 2: 00/14-02-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 02
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 14-2-37-3
Operator Name: NAL Resources Limited
License Number: 0110012
License Date: 1984-10-18
License Status: Issued
Spud Date: 1984-10-21
Final Drill Date: 1984-11-02
Well Total Depth: 2309.00 m
Surface Hole Latitude: 52.158515
Surface Hole Longitude: -114.328211

For data sources see[1][2]

Well History

Date Event
1984-10-18 Obtained License
1984-10-22 Surface Casing Operation Performed
1984-11-02 Finished Drilling
1984-11-02 Well Mode changed to Drilled and Cased
1984-11-03 Well Log Performed
1984-11-04 Drill Stem Test Performed
1984-11-06 Drill Stem Test Performed
1984-11-08 Lost Circulation Occurred
1984-11-09 Production Casing Operation Performed
1984-11-09 Well Log Performed
1984-11-10 Rig Released
1984-11-14 Well Log Performed
1984-11-15 Perforation Treatment Performed - Jet Perforation
1984-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-17 Perforation Treatment Performed - Cement Squeeze
1984-11-21 Well Log Performed
1984-11-22 Perforation Treatment Performed - Jet Perforation
1984-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-12 Perforation Treatment Performed - Cement Squeeze
1984-12-18 Perforation Treatment Performed - Jet Perforation
1984-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-10 Perforation Treatment Performed - Cement Squeeze
1985-01-15 Well Log Performed
1985-01-16 Perforation Treatment Performed - Jet Perforation
1985-01-18 Perforation Treatment Performed - Fractured
1985-01-18 Well Log Performed
1985-01-22 Perforation Treatment Performed - Jet Perforation
1985-01-22 Well Log Performed
1985-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-24 Perforation Treatment Performed - Fractured
1985-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-27 Well Began Production
1985-01-27 Well Fluid changed to Crude Oil
1985-01-27 Well Mode changed to Flowing
1985-05-31 Well Fluid changed to Crude Oil
1985-05-31 Well Mode changed to Suspended
1985-06-25 Well Fluid changed to Crude Oil
1985-06-25 Well Mode changed to Abandoned Zone
1985-06-26 Perforation Treatment Performed - Fractured
1985-06-26 Perforation Treatment Performed - Jet Perforation
1985-11-06 Well Log Performed
1985-11-07 Perforation Treatment Performed - Jet Perforation
1985-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-08 Perforation Treatment Performed - Cement Squeeze
1985-11-09 Perforation Treatment Performed - Remedial Casing
1985-11-17 Perforation Treatment Performed - Jet Perforation
1985-11-22 Well Log Performed
1985-11-23 Perforation Treatment Performed - Fractured
1985-11-23 Perforation Treatment Performed - Jet Perforation
1985-12-01 Well Fluid changed to Crude Oil
1985-12-01 Well Mode changed to Flowing
1985-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-26 Well Fluid changed to Crude Oil
1987-07-26 Well Mode changed to Suspended
1991-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-26 Perforation Treatment Performed - Jet Perforation
2000-03-02 Perforation Treatment Performed - Cement Squeeze
2000-03-12 Perforation Treatment Performed - Cement Squeeze
2000-03-12 Plug Back Performed
2000-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-04-03 Perforation Treatment Performed - Jet Perforation
2004-04-03 Plug Back Performed
2004-04-03 Well Fluid changed to Crude Oil
2004-04-03 Well Mode changed to Abandoned Zone
2004-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-04-07 Perforation Treatment Performed - Jet Perforation
2004-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-11-15 Perforation 2290.00 2291.00 13
1985-01-10 Cement Squeeze 2266.00 2269.00 0
1985-01-16 Perforation 2266.00 2268.00 13
1985-01-18 Fracture 2266.00 2268.00 0
1985-01-22 Perforation 2259.00 2261.00 13
1985-01-24 Acid Treatment 2259.00 2261.00 0
1985-01-24 Fracture 2259.00 2261.00 0
1985-01-25 Acid Treatment 2259.00 2261.00 0
1985-06-26 Perforation 2215.00 2220.00 13
1985-06-26 Fracture 2215.00 2220.00 0
1985-11-07 Perforation 1575.00 1576.00 13
1984-11-15 Perforation 1600.00 1601.00 13
1985-11-08 Acid Treatment 2215.00 2220.00 0
1985-11-08 Cement Squeeze 2215.00 2220.00 0
1985-11-09 Remedial Casing Cementing 1575.00 1576.00 0
1985-11-17 Perforation 2259.00 2261.00 13
1985-11-23 Perforation 2217.50 2220.00 13
1985-11-23 Fracture 2217.50 2220.00 0
1985-12-02 Acid Treatment 2217.50 2220.00 0
1991-04-26 Acid Treatment 2217.50 2220.00 0
1998-02-26 Perforation 2203.00 2208.00 18
2000-03-02 Cement Squeeze 2203.00 2208.00 0
1984-11-16 Acid Treatment 2290.00 2291.00 0
2000-03-12 Cement Squeeze 2217.50 2220.00 0
2000-03-18 Acid Treatment 2259.00 2261.00 0
2004-04-03 Packing Device Capped w/Cement 2241.00 2249.00 0
2004-04-03 Perforation 2203.00 2209.00 20
2004-04-04 Acid Treatment 2203.00 2209.00 0
2004-04-07 Perforation 2215.00 2220.00 20
2004-04-08 Acid Treatment 2203.00 2220.00 0
2008-07-30 Acid Treatment 2203.00 2220.00 0
1984-11-17 Cement Squeeze 1600.00 2291.00 0
1984-11-22 Perforation 1575.00 1576.00 13
1984-12-12 Acid Treatment 1575.00 1576.00 0
1984-12-12 Cement Squeeze 1575.00 1576.00 0
1984-12-18 Perforation 2266.00 2269.00 6
1984-12-19 Acid Treatment 2266.00 2269.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2828 0.0 0.0 0.0
1986 3136 0.0 0.0 0.0
1987 4774 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-11-08 Lost Circulation 2309.00 2309.00

For data sources see[6]

References