X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375030306023

Well Details

Well ID: 0375030306023
Loading map...
Location: 02/06-03-037-03W5/3
Location Alias: 02/06-03-37-03 W5M
Location Alias 2: 02/06-03-037-03 W5/03
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 03
County/Municipality: Red Deer County
Well Name: BONAVISTA SYLAKE 6-3-37-3
Operator Name: Bonavista Energy Corporation
License Number: 0373016
License Date: 2007-01-25
License Status: Suspension
Spud Date: 2007-03-05
Final Drill Date: 2007-03-11
Well Total Depth: 2271.00 m
Surface Hole Latitude: 52.150732
Surface Hole Longitude: -114.348129

For data sources see[1][2]

Well History

Date Event
2007-01-25 Obtained License
2007-03-06 Surface Casing Operation Performed
2007-03-11 Finished Drilling
2007-03-11 Well Log Performed
2007-03-11 Well Mode changed to Drilled and Cased
2007-03-13 Production Casing Operation Performed
2007-03-13 Rig Released
2007-05-10 Perforation Treatment Performed - Jet Perforation
2007-05-10 Well Log Performed
2007-08-14 Perforation Treatment Performed - Fractured
2008-05-31 Well Log Performed
2008-06-01 Perforation Treatment Performed - Jet Perforation
2008-06-04 Well Log Performed
2008-06-28 Well Log Performed
2008-06-30 Perforation Treatment Performed - Fractured
2008-07-03 Well Log Performed
2008-07-04 Perforation Treatment Performed - Jet Perforation
2008-07-04 Well Log Performed
2008-07-17 Perforation Treatment Performed - Fractured
2008-07-18 Well Fluid changed to Gas
2008-07-18 Well Mode changed to Testing
2008-08-06 Well Structure changed to Commingled
2019-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-07-11 Plug Back Performed
2019-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-07-12 Plug Back Performed
2019-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-07-15 Perforation Treatment Performed - Jet Perforation
2019-07-15 Plug Back Performed
2019-07-15 Well Mode changed to Abandoned Zone
2019-07-15 Well Structure changed to Commingled
2019-07-16 Perforation Treatment Performed - Cement Plug
2019-07-16 Perforation Treatment Performed - Cement Squeeze
2019-07-16 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-05-10 Perforation 2247.00 2251.00 17
2019-07-15 Perforation 781.50 783.50 20
2019-07-16 Cement Squeeze 781.50 783.50 0
2019-07-16 Cement Plug 764.00 774.00 0
2007-08-14 Fracture 2247.00 2251.00 0
2008-06-01 Perforation 2210.00 2211.50 17
2008-06-30 Fracture 2210.00 2211.50 0
2008-07-04 Perforation 2185.50 2187.50 17
2008-07-17 Fracture 2185.50 2187.50 0
2019-07-11 Packing Device Capped w/Cement 2232.00 2240.00 0
2019-07-12 Packing Device Capped w/Cement 2192.00 2200.00 0
2019-07-15 Packing Device Capped w/Cement 2172.00 2180.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 10 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-07-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References