If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375030504003 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/04-05-037-03W5/3 | |
Location Alias: 00/04-05-37-03 W5M | |
Location Alias 2: 00/04-05-037-03 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 03 | |
Section: 05 | |
County/Municipality: Red Deer County | |
Well Name: DEKALB LANAWAY 4-5-37-3 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0023569 | |
License Date: 1962-12-27 | |
License Status: RecCertified | |
Spud Date: 1963-01-01 | |
Final Drill Date: 1963-02-21 | |
Well Total Depth: 2951.40 m | |
Surface Hole Latitude: 52.146354 | |
Surface Hole Longitude: -114.403205 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1962-12-27 | Obtained License |
1963-01-17 | Drill Stem Test Performed |
1963-01-19 | Drill Stem Test Performed |
1963-01-22 | Drill Stem Test Performed |
1963-01-24 | Drill Stem Test Performed |
1963-01-26 | Drill Stem Test Performed |
1963-01-28 | Drill Stem Test Performed |
1963-02-21 | Drill Stem Test Performed |
1963-02-21 | Finished Drilling |
1963-02-21 | Well Mode changed to Drilled and Cased |
1963-02-23 | Production Casing Operation Performed |
1963-05-02 | Perforation Treatment Performed - Jet Perforation |
1963-05-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-11-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1963-11-06 | Perforation Treatment Performed - Selective Jet Perforations |
1963-11-09 | Perforation Treatment Performed - Cement Squeeze |
1963-11-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-11-14 | Perforation Treatment Performed - Jet Perforation |
1963-11-15 | Perforation Treatment Performed - Cement Squeeze |
1963-11-17 | Perforation Treatment Performed - Cement Squeeze |
1963-11-28 | Perforation Treatment Performed - Acid Wash - No Pressure |
1963-11-28 | Perforation Treatment Performed - Cement Squeeze |
1963-12-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-12-02 | Perforation Treatment Performed - Jet Perforation |
1963-12-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-12-05 | Perforation Treatment Performed - Fractured |
1986-08-18 | Perforation Treatment Performed - Cement Squeeze |
1986-08-21 | Well Log Performed |
1986-08-22 | Perforation Treatment Performed - Jet Perforation |
1986-08-22 | Perforation Treatment Performed - Remedial Casing |
1986-08-22 | Well Log Performed |
1986-08-28 | Perforation Treatment Performed - Jet Perforation |
1986-08-29 | Well Log Performed |
1986-08-30 | Perforation Treatment Performed - Cement Squeeze |
1986-09-07 | Perforation Treatment Performed - Jet Perforation |
1986-09-07 | Well Log Performed |
1986-09-09 | Well Began Production |
1986-09-09 | Well Fluid changed to Gas |
1986-09-09 | Well Mode changed to Flowing |
1986-09-12 | Well Log Performed |
1986-09-23 | Well Log Performed |
1986-10-01 | Well Log Performed |
1986-10-10 | Well Log Performed |
1986-11-30 | Well Fluid changed to Gas |
1986-11-30 | Well Mode changed to Suspended |
1988-02-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-02-17 | Perforation Treatment Performed - Cement Plug |
1988-02-17 | Plug Back Performed |
1988-02-17 | Well Fluid changed to Gas |
1988-02-17 | Well Mode changed to Abandoned |
1988-02-19 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-05-02 | Perforation | 2311.00 | 2312.50 | 13 |
1963-11-28 | Acid Wash | 1786.70 | 1788.30 | 0 |
1963-11-28 | Cement Squeeze | 1786.70 | 1788.30 | 0 |
1963-12-02 | Perforation | 1786.70 | 1788.30 | 13 |
1963-12-02 | Acid Treatment | 1786.70 | 1788.30 | 0 |
1963-12-05 | Acid Treatment | 1786.70 | 1788.30 | 0 |
1963-12-05 | Fracture | 1786.70 | 1788.30 | 0 |
1986-08-18 | Cement Squeeze | 1786.70 | 1788.30 | 0 |
1986-08-22 | Perforation | 861.50 | 862.00 | 16 |
1986-08-22 | Remedial Casing Cementing | 861.50 | 862.00 | 0 |
1986-08-28 | Perforation | 2311.00 | 2312.50 | 13 |
1963-05-03 | Acid Treatment | 2311.00 | 2312.50 | 0 |
1986-08-30 | Cement Squeeze | 2311.00 | 2312.50 | 0 |
1986-09-07 | Perforation | 2354.60 | 2356.10 | 7 |
1986-09-07 | Perforation | 2357.30 | 2358.80 | 7 |
1986-09-07 | Perforation | 2359.50 | 2360.70 | 7 |
1986-09-07 | Perforation | 2361.60 | 2362.20 | 7 |
1986-09-07 | Perforation | 2363.40 | 2364.30 | 7 |
1986-09-07 | Perforation | 2365.20 | 2365.90 | 7 |
1986-09-07 | Perforation | 2366.50 | 2368.00 | 7 |
1986-09-07 | Perforation | 2368.90 | 2369.80 | 7 |
1986-09-07 | Perforation | 2370.70 | 2373.20 | 7 |
1963-11-06 | Packing Device Capped w/Cement | 1856.20 | 1856.20 | 0 |
1988-02-17 | Packing Device Capped w/Cement | 2337.00 | 2345.00 | 0 |
1988-02-17 | Packing Device Capped w/Cement | 865.00 | 873.00 | 0 |
1988-02-17 | Cement Plug | 850.00 | 865.00 | 0 |
1963-11-06 | Selective Jet Perforations | 1837.90 | 1837.90 | 0 |
1963-11-09 | Cement Squeeze | 1837.90 | 1837.90 | 0 |
1963-11-14 | Perforation | 1786.70 | 1788.30 | 13 |
1963-11-14 | Acid Treatment | 1786.70 | 1788.30 | 0 |
1963-11-15 | Cement Squeeze | 1786.70 | 1788.30 | 0 |
1963-11-17 | Cement Squeeze | 1786.70 | 1788.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 720 | 0.0 | 0.0 | 0.0 |
1988 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]