X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375030807000

Well Details

Well ID: 0375030807000
Loading map...
Location: 00/07-08-037-03W5/0
Location Alias: 00/07-08-37-03 W5M
Location Alias 2: 00/07-08-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 08
County/Municipality: Red Deer County
Well Name: NAL HZ SYLAKE 7-8-37-3
Operator Name: NAL Resources Limited
License Number: 0421288
License Date: 2010-06-18
License Status: Amended
Spud Date: 2010-07-22
Final Drill Date: 2010-08-10
Well Total Depth: 3226.00 m
Surface Hole Latitude: 52.160419
Surface Hole Longitude: -114.405129

For data sources see[1][2]

Well History

Date Event
2010-06-18 Obtained License
2010-07-23 Surface Casing Operation Performed
2010-07-28 Direction Drilling Operation Performed - Horizontal
2010-07-28 Well Log Performed
2010-08-04 Intermediate Casing Operation Performed
2010-08-04 Well Log Performed
2010-08-10 Finished Drilling
2010-08-10 Well Mode changed to Drilled and Cased
2010-08-12 Liner Casing Operation Performed
2010-08-12 Perforation Treatment Performed - Slotted Liner or Casing
2010-08-13 Liner Casing Operation Performed
2010-08-13 Perforation Treatment Performed - Open-Hole Completion
2010-08-13 Perforation Treatment Performed - Slotted Liner or Casing
2010-08-14 Rig Released
2010-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-05 Well Began Production
2010-10-05 Well Fluid changed to Crude Oil
2010-10-05 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-28 2126.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-12 Slotted Liner 3114.40 3186.70 0
2010-08-13 Slotted Liner 2976.00 3063.00 0
2010-08-13 Slotted Liner 2649.10 2860.70 0
2010-08-13 Open Hole/Barefoot Completion 3186.00 3226.00 0
2010-08-13 Open Hole/Barefoot Completion 3063.00 3114.40 0
2010-08-13 Open Hole/Barefoot Completion 2860.70 2976.00 0
2010-09-02 Acid Treatment 2649.10 3200.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2078 0.0 0.0 0.0
2011 7952 0.0 0.0 0.0
2012 8398 0.0 0.0 0.0
2013 7886 0.0 0.0 0.0
2014 8600 0.0 0.0 0.0
2015 7714 0.0 0.0 0.0
2016 7864 0.0 0.0 0.0
2017 8303 0.0 0.0 0.0
2018 8522 0.0 0.0 0.0
2019 8710 0.0 0.0 0.0
2020 2040 0.0 0.0 0.0

For data sources see[6]

References