X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375030914003

Well Details

Well ID: 0375030914003
Loading map...
Location: 00/14-09-037-03W5/3
Location Alias: 00/14-09-37-03 W5M
Location Alias 2: 00/14-09-037-03 W5/03
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 09
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 14-9-37-3
Operator Name: Cenovus Energy Inc.
License Number: 0098866
License Date: 1982-11-16
License Status: RecExempt
Spud Date: 1982-11-16
Final Drill Date: 1982-12-07
Well Total Depth: 2375.00 m
Surface Hole Latitude: 52.170428
Surface Hole Longitude: -114.371622

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-11-16 Obtained License
1982-11-27 Drill Stem Test Performed
1982-12-05 Drill Stem Test Performed
1982-12-07 Finished Drilling
1982-12-07 Well Mode changed to Drilled and Cased
1982-12-09 Production Casing Operation Performed
1983-01-16 Perforation Treatment Performed - Jet Perforation
1983-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-21 Perforation Treatment Performed - Fractured
1984-06-02 Well Log Performed
1984-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-06-03 Plug Back Performed
1984-06-04 Perforation Treatment Performed - Jet Perforation
1984-06-08 Perforation Treatment Performed - Fractured
1996-09-14 Perforation Treatment Performed - Cement Squeeze
1996-09-14 Plug Back Performed
1996-09-16 Perforation Treatment Performed - Jet Perforation
1996-09-16 Well Log Performed
1996-09-17 Perforation Treatment Performed - Jet Perforation
1998-09-29 Well Log Performed
1998-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-30 Perforation Treatment Performed - Jet Perforation
1998-09-30 Plug Back Performed
1998-09-30 Well Mode changed to Drilled and Cased
1998-10-01 Well Began Production
1998-10-01 Well Fluid changed to Gas
1998-10-01 Well Mode changed to Flowing
1998-10-05 Perforation Treatment Performed - Fractured
1999-02-28 Well Fluid changed to Gas
1999-02-28 Well Mode changed to Suspended
2000-07-28 Well Fluid changed to Gas
2000-07-28 Well Mode changed to Flowing
2001-09-30 Well Log Performed
2001-10-01 Perforation Treatment Performed - Cement Squeeze
2001-10-01 Perforation Treatment Performed - Jet Perforation
2001-10-01 Well Log Performed
2001-10-02 Perforation Treatment Performed - Cement Squeeze
2001-10-02 Perforation Treatment Performed - Jet Perforation
2001-10-03 Well Log Performed
2001-10-05 Perforation Treatment Performed - Jet Perforation
2001-10-05 Well Log Performed
2001-10-06 Perforation Treatment Performed - Cement Squeeze
2001-10-07 Perforation Treatment Performed - Jet Perforation
2001-10-08 Perforation Treatment Performed - Cement Squeeze
2001-10-09 Well Log Performed
2003-09-01 Well Fluid changed to Gas
2003-09-01 Well Mode changed to Suspended
2012-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-03 Plug Back Performed
2012-08-03 Well Fluid changed to Gas
2012-08-03 Well Mode changed to Abandoned Zone
2012-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-17 Well Abandoned
2012-08-17 Well Fluid changed to Gas
2012-08-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-01-16 Perforation 2292.00 2300.00 7
1996-09-17 Perforation 2285.00 2289.50 17
1998-09-30 Perforation 2258.50 2261.00 17
1998-09-30 Perforation 2262.00 2264.50 17
1998-09-30 Packing Device Capped w/Cement 2274.00 2282.00 0
1998-10-05 Fracture 2258.50 2264.50 0
2001-10-01 Perforation 615.00 616.00 13
2001-10-01 Cement Squeeze 615.00 616.00 0
2001-10-02 Perforation 595.00 596.00 13
2001-10-02 Cement Squeeze 595.00 596.00 0
2001-10-05 Perforation 565.00 566.00 13
1983-01-17 Acid Treatment 2292.00 2300.00 0
2001-10-06 Cement Squeeze 565.00 566.00 0
2001-10-07 Perforation 450.00 451.00 13
2001-10-08 Cement Squeeze 450.00 451.00 0
2012-08-03 Packing Device Capped w/Cement 2242.00 2250.00 0
2012-08-07 Packing Device Capped w/Cement 434.00 442.00 0
2012-08-07 Packing Device Capped w/Cement 2002.00 2010.00 0
1983-01-21 Fracture 2292.00 2300.00 0
1984-06-03 Packing Device Capped w/Cement 2282.00 2290.00 0
1984-06-04 Perforation 2015.50 2017.00 7
1984-06-04 Perforation 2018.00 2019.50 7
1984-06-08 Fracture 2015.50 2019.50 0
1996-09-14 Cement Squeeze 2015.50 2019.50 0
1996-09-16 Perforation 2292.00 2300.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1556 0.0 0.0 0.0
1999 624 0.0 0.0 0.0
2000 1315 0.0 0.0 0.0
2001 1110 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-17 No Incident Encountered 0.00 0.00
2012-08-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References