X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375031307000

Well Details

Well ID: 0375031307000
Loading map...
Location: 00/07-13-037-03W5/0
Location Alias: 00/07-13-37-03 W5M
Location Alias 2: 00/07-13-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 13
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 7-13-37-3
Operator Name: NAL Resources Limited
License Number: 0045278
License Date: 1973-03-01
License Status: Issued
Spud Date: 1973-03-10
Final Drill Date: 1973-03-24
Well Total Depth: 2229.60 m
Surface Hole Latitude: 52.177635
Surface Hole Longitude: -114.294029

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-03-01 Obtained License
1973-03-24 Finished Drilling
1973-03-24 Well Mode changed to Drilled and Cased
1973-03-26 Production Casing Operation Performed
1973-05-26 Perforation Treatment Performed - Jet Perforation
1973-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-05-31 Perforation Treatment Performed - Jet Perforation
1973-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-06-12 Well Mode changed to Abandoned Zone
1973-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-13 Perforation Treatment Performed - Jet Perforation
1975-11-01 Well Began Production
1975-11-01 Well Fluid changed to Gas
1975-11-01 Well Mode changed to Flowing
2011-08-01 Well Fluid changed to Gas
2011-08-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-05-26 Perforation 2182.40 2188.50 7
1973-05-27 Acid Treatment 2182.40 2188.50 0
1973-05-31 Perforation 2190.30 2193.00 7
1973-05-31 Acid Treatment 2182.40 2193.00 0
1973-06-12 Packing Device Capped w/Cement 2157.40 2159.20 0
1973-06-13 Perforation 2127.80 2132.40 7
1973-06-13 Acid Treatment 2127.80 2132.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 46 0.0 0.0 0.0
1975 504 0.0 0.0 0.0
1976 537 0.0 0.0 0.0
1977 4486 0.0 0.0 0.0
1978 6127 0.0 0.0 0.0
1979 6808 0.0 0.0 0.0
1980 5308 0.0 0.0 0.0
1981 5771 0.0 0.0 0.0
1982 4448 0.0 0.0 0.0
1983 1861 0.0 0.0 0.0
1984 1256 0.0 0.0 0.0
1985 6116 0.0 0.0 0.0
1986 5358 0.0 0.0 0.0
1987 8293 0.0 0.0 0.0
1988 8472 0.0 0.0 0.0
1989 7529 0.0 0.0 0.0
1990 1830 0.0 0.0 0.0
1991 3427 0.0 0.0 0.0
1992 3614 0.0 0.0 0.0
1993 8439 0.0 0.0 0.0
1994 8318 0.0 0.0 0.0
1995 7962 0.0 0.0 0.0
1996 8312 0.0 0.0 0.0
1997 7808 0.0 0.0 0.0
1998 8364 0.0 0.0 0.0
1999 8411 0.0 0.0 0.0
2000 8439 0.0 0.0 0.0
2001 8398 0.0 0.0 0.0
2002 8725 0.0 0.0 0.0
2003 8534 0.0 0.0 0.0
2004 8682 0.0 0.0 0.0
2005 8132 0.0 0.0 0.0
2006 7749 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8450 0.0 0.0 0.0
2009 8661 0.0 0.0 0.0
2010 8632 0.0 0.0 0.0
2011 8390 0.0 0.0 0.0
2012 8430 0.0 0.0 0.0
2013 8741 0.0 0.0 0.0
2014 8650 0.0 0.0 0.0
2015 8439 0.0 0.0 0.0
2016 8665 0.0 0.0 0.0
2017 7608 0.0 0.0 0.0
2018 8597 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References