X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375032304000

Well Details

Well ID: 0375032304000
Loading map...
Location: 00/04-23-037-03W5/0
Location Alias: 00/04-23-37-03 W5M
Location Alias 2: 00/04-23-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 23
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 4-23-37-3
Operator Name: NAL Resources Limited
License Number: 0026149
License Date: 1964-05-25
License Status: Abandoned
Spud Date: 1964-05-28
Final Drill Date: 1964-06-15
Well Total Depth: 2300.60 m
Surface Hole Latitude: 52.189915
Surface Hole Longitude: -114.331069

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-05-25 Obtained License
1964-06-07 Drill Stem Test Performed
1964-06-15 Finished Drilling
1964-06-15 Well Mode changed to Drilled and Cased
1964-06-17 Drill Stem Test Performed
1964-06-18 Drill Stem Test Performed
1964-06-19 Production Casing Operation Performed
1964-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-22 Perforation Treatment Performed - Acid Wash - No Pressure
1964-06-22 Perforation Treatment Performed - Jet Perforation
1964-07-04 Well Began Production
1964-07-04 Well Fluid changed to Crude Oil
1964-07-04 Well Mode changed to Flowing
1964-07-07 Perforation Treatment Performed - Cement Squeeze
1964-07-09 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-09 Perforation Treatment Performed - Cement Squeeze
1964-07-09 Perforation Treatment Performed - Fractured
1964-07-15 Drill Stem Test Performed
1964-07-19 Drill Stem Test Performed
1964-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-20 Perforation Treatment Performed - Jet Perforation
1964-07-21 Perforation Treatment Performed - Cement Squeeze
1964-07-21 Perforation Treatment Performed - Jet Perforation
1964-07-25 Perforation Treatment Performed - Acid Wash - No Pressure
1964-07-25 Perforation Treatment Performed - Jet Perforation
1964-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-30 Perforation Treatment Performed - Jet Perforation
1964-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-06 Well Fluid changed to Crude Oil
1964-08-06 Well Mode changed to Pumping
1987-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-16 Perforation Treatment Performed - Jet Perforation
2005-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-03 Plug Back Performed
2005-06-03 Well Fluid changed to Crude Oil
2005-06-03 Well Mode changed to Abandoned Zone
2005-06-05 Perforation Treatment Performed - Cement Plug
2005-06-08 Perforation Treatment Performed - Cement Plug
2005-06-09 Perforation Treatment Performed - Cement Plug
2007-06-22 Well Abandoned
2007-06-22 Well Fluid changed to Crude Oil
2007-06-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-06-22 Perforation 2256.70 2258.30 7
1964-07-20 Acid Treatment 2256.70 2258.30 0
1964-07-21 Perforation 2260.10 2260.70 7
1964-07-21 Cement Squeeze 2256.70 2260.70 0
1964-07-25 Perforation 2256.40 2257.30 7
1964-07-25 Acid Wash 2256.40 2257.30 0
1964-07-30 Perforation 2251.60 2253.70 7
1964-07-30 Acid Treatment 2251.60 2253.70 0
1964-07-31 Acid Treatment 2251.60 2253.70 0
1964-08-01 Acid Treatment 2251.60 2253.70 0
1987-04-16 Perforation 2251.50 2256.70 7
1964-06-22 Acid Wash 2256.70 2258.30 0
1987-04-16 Acid Treatment 2251.50 2257.30 0
2005-06-03 Packing Device Capped w/Cement 1148.70 2169.70 0
2005-06-05 Cement Plug 505.70 1148.70 0
2005-06-08 Cement Plug 163.30 505.70 0
2005-06-09 Cement Plug 113.90 163.30 0
1964-06-22 Acid Treatment 2256.70 2258.30 0
1964-07-07 Cement Squeeze 2256.70 2258.30 0
1964-07-09 Hydra Jet Perforation 2258.10 2258.30 0
1964-07-09 Acid Treatment 2258.10 2258.30 0
1964-07-09 Fracture 2258.10 2258.30 0
1964-07-09 Cement Squeeze 2258.10 2258.30 0
1964-07-20 Perforation 2256.70 2258.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7804 0.0 0.0 0.0
1968 5734 0.0 0.0 0.0
1969 6645 0.0 0.0 0.0
1970 6831 0.0 0.0 0.0
1971 7636 0.0 0.0 0.0
1972 7549 0.0 0.0 0.0
1973 6499 0.0 0.0 0.0
1974 5739 0.0 0.0 0.0
1975 5271 0.0 0.0 0.0
1976 7870 0.0 0.0 0.0
1977 8197 0.0 0.0 0.0
1978 7746 0.0 0.0 0.0
1979 7997 0.0 0.0 0.0
1980 7456 0.0 0.0 0.0
1981 7752 0.0 0.0 0.0
1982 7590 0.0 0.0 0.0
1983 8170 0.0 0.0 0.0
1984 7432 0.0 0.0 0.0
1985 7844 0.0 0.0 0.0
1986 7410 0.0 0.0 0.0
1987 6751 0.0 0.0 0.0
1988 8270 0.0 0.0 0.0
1989 7822 0.0 0.0 0.0
1990 6434 0.0 0.0 0.0
1991 8511 0.0 0.0 0.0
1992 8208 0.0 0.0 0.0
1993 7124 0.0 0.0 0.0
1994 8249 0.0 0.0 0.0
1995 8438 0.0 0.0 0.0
1996 8374 0.0 0.0 0.0
1997 8193 0.0 0.0 0.0
1998 8430 0.0 0.0 0.0
1999 8461 0.0 0.0 0.0
2000 8477 0.0 0.0 0.0
2001 8577 0.0 0.0 0.0
2002 8515 0.0 0.0 0.0
2003 8165 0.0 0.0 0.0
2004 8411 0.0 0.0 0.0
2005 2896 0.0 0.0 0.0

For data sources see[5]

References