X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375033010002

Well Details

Well ID: 0375033010002
Loading map...
Location: 00/10-30-037-03W5/2
Location Alias: 00/10-30-37-03 W5M
Location Alias 2: 00/10-30-037-03 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 30
County/Municipality: Red Deer County
Well Name: NAL SYLVAN LAKE 10-30-37-3
Operator Name: NAL Resources Limited
License Number: 0023010
License Date: 1962-09-17
License Status: Abandoned
Spud Date: 1962-10-05
Final Drill Date: 1962-11-19
Well Total Depth: 2865.10 m
Surface Hole Latitude: 52.211781
Surface Hole Longitude: -114.415276

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-09-17 Obtained License
1962-10-27 Drill Stem Test Performed
1962-10-28 Drill Stem Test Performed
1962-10-29 Drill Stem Test Performed
1962-11-19 Finished Drilling
1962-11-19 Well Mode changed to Drilled and Cased
1962-11-20 Drill Stem Test Performed
1962-11-22 Drill Stem Test Performed
1962-11-23 Production Casing Operation Performed
1962-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-11-24 Perforation Treatment Performed - Acid Wash - No Pressure
1962-11-24 Perforation Treatment Performed - Jet Perforation
1962-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-11-27 Perforation Treatment Performed - Acid Wash - No Pressure
1962-11-27 Perforation Treatment Performed - Cement Squeeze
1962-11-27 Perforation Treatment Performed - Jet Perforation
1962-12-12 Perforation Treatment Performed - Acid Wash - No Pressure
1962-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-21 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-12-22 Perforation Treatment Performed - Fractured
1964-02-05 Perforation Treatment Performed - Fractured
2004-08-21 Perforation Treatment Performed - Cement Squeeze
2004-08-21 Plug Back Performed
2004-08-21 Well Log Performed
2004-08-29 Well Log Performed
2004-08-30 Well Log Performed
2004-08-31 Perforation Treatment Performed - Jet Perforation
2004-09-01 Perforation Treatment Performed - Cement Squeeze
2004-09-01 Plug Back Performed
2004-09-01 Well Log Performed
2004-09-18 Well Log Performed
2004-09-22 Perforation Treatment Performed - Jet Perforation
2004-09-23 Perforation Treatment Performed - Fractured
2005-09-12 Perforation Treatment Performed - Cement Plug
2005-09-12 Plug Back Performed
2005-09-12 Well Mode changed to Abandoned Zone
2005-09-13 Perforation Treatment Performed - Jet Perforation
2005-09-13 Perforation Treatment Performed - Remedial Casing
2005-09-13 Well Log Performed
2005-09-15 Perforation Treatment Performed - Jet Perforation
2005-09-16 Perforation Treatment Performed - Remedial Casing
2005-09-17 Perforation Treatment Performed - Cement Plug
2005-09-17 Perforation Treatment Performed - Jet Perforation
2005-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-18 Plug Back Performed
2005-09-18 Well Log Performed
2005-09-19 Perforation Treatment Performed - Jet Perforation
2005-09-19 Well Log Performed
2005-09-20 Perforation Treatment Performed - Cement Plug
2005-09-20 Plug Back Performed
2005-12-20 Well Abandoned
2005-12-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-11-24 Perforation 2259.50 2260.70 13
1962-12-19 Acid Treatment 2250.30 2253.40 0
1962-12-21 Hydra Jet Perforation 2250.90 2250.90 0
1962-12-22 Fracture 2250.30 2253.40 0
1964-02-05 Fracture 2250.30 2253.40 0
2004-08-21 Cement Squeeze 2250.30 2253.40 0
2004-08-31 Perforation 1230.00 1231.00 14
2004-09-01 Cement Squeeze 1230.00 1231.00 0
2004-09-22 Perforation 2230.00 2237.20 14
2004-09-23 Fracture 2230.00 2237.20 0
2005-09-12 Cement Plug 2209.00 2221.30 0
1962-11-24 Perforation 2265.30 2267.70 13
2005-09-13 Perforation 1317.00 1318.00 14
2005-09-13 Remedial Casing Cementing 1317.00 1318.00 0
2005-09-15 Perforation 955.00 956.00 14
2005-09-16 Remedial Casing Cementing 955.00 956.00 0
2005-09-17 Cement Plug 934.30 943.30 0
2005-09-17 Perforation 414.00 415.00 14
2005-09-18 Packing Device Capped w/Cement 366.00 440.00 0
2005-09-19 Perforation 339.00 340.00 14
2005-09-20 Cement Plug 311.40 330.00 0
1962-11-24 Acid Wash 2259.50 2267.70 0
1962-11-24 Acid Treatment 2259.50 2267.70 0
1962-11-27 Cement Squeeze 2259.50 2267.70 0
1962-11-27 Perforation 2250.30 2253.40 7
1962-11-27 Acid Wash 2250.30 2253.40 0
1962-11-27 Acid Treatment 2250.30 2253.40 0
1962-12-12 Acid Wash 2250.30 2253.40 0

For data sources see[4]



References