X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375033012000

Well Details

Well ID: 0375033012000
Loading map...
Location: 00/12-30-037-03W5/0
Location Alias: 00/12-30-37-03 W5M
Location Alias 2: 00/12-30-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 30
County/Municipality: Red Deer County
Well Name: NAL SYLVAN LAKE 12-30-37-3
Operator Name: NAL Resources Limited
License Number: 0023420
License Date: 1962-11-29
License Status: Issued
Spud Date: 1962-12-08
Final Drill Date: 1962-12-26
Well Total Depth: 2290.60 m
Surface Hole Latitude: 52.211776
Surface Hole Longitude: -114.427002

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-11-29 Obtained License
1962-12-26 Finished Drilling
1962-12-26 Well Mode changed to Drilled and Cased
1962-12-27 Drill Stem Test Performed
1962-12-28 Production Casing Operation Performed
1962-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-29 Perforation Treatment Performed - Acid Wash - No Pressure
1962-12-29 Perforation Treatment Performed - Jet Perforation
1963-02-02 Well Began Production
1963-02-02 Well Fluid changed to Crude Oil
1963-02-02 Well Mode changed to Pumping
1963-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-07-22 Perforation Treatment Performed - Nitrogen Treatment
1964-03-28 Perforation Treatment Performed - Fractured
1990-05-10 Perforation Treatment Performed - Jet Perforation
1991-05-07 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-12-29 Perforation 2270.50 2272.90 13
1962-12-29 Acid Wash 2270.50 2272.90 0
1962-12-29 Acid Treatment 2270.50 2272.90 0
1963-07-22 Acid Treatment 2270.50 2272.90 0
1963-07-22 Nitrogen Treatment 2270.50 2272.90 0
1964-03-28 Fracture 2270.50 2272.90 0
1990-05-10 Perforation 2261.60 2266.50 13
1990-05-10 Perforation 2270.50 2272.90 13
1991-05-07 Fracture 2261.60 2272.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5527 0.0 0.0 0.0
1968 4306 0.0 0.0 0.0
1969 2622 0.0 0.0 0.0
1970 2832 0.0 0.0 0.0
1971 3308 0.0 0.0 0.0
1972 5360 0.0 0.0 0.0
1973 7577 0.0 0.0 0.0
1974 3242 0.0 0.0 0.0
1975 3773 0.0 0.0 0.0
1976 5065 0.0 0.0 0.0
1977 6301 0.0 0.0 0.0
1978 6301 0.0 0.0 0.0
1979 5829 0.0 0.0 0.0
1980 5995 0.0 0.0 0.0
1981 6304 0.0 0.0 0.0
1982 6432 0.0 0.0 0.0
1983 7616 0.0 0.0 0.0
1984 7701 0.0 0.0 0.0
1985 6392 0.0 0.0 0.0
1986 7902 0.0 0.0 0.0
1987 8425 0.0 0.0 0.0
1988 8461 0.0 0.0 0.0
1989 8643 0.0 0.0 0.0
1990 8327 0.0 0.0 0.0
1991 5564 0.0 0.0 0.0
1992 5750 0.0 0.0 0.0
1993 8150 0.0 0.0 0.0
1994 8085 0.0 0.0 0.0
1995 8550 0.0 0.0 0.0
1996 8536 0.0 0.0 0.0
1997 8643 0.0 0.0 0.0
1998 8713 0.0 0.0 0.0
1999 8563 0.0 0.0 0.0
2000 8742 0.0 0.0 0.0
2001 8359 0.0 0.0 0.0
2002 8362 0.0 0.0 0.0
2003 8488 0.0 0.0 0.0
2004 8743 0.0 0.0 0.0
2005 8651 0.0 0.0 0.0
2006 8495 0.0 0.0 0.0
2007 8735 0.0 0.0 0.0
2008 7600 0.0 0.0 0.0
2009 8534 0.0 0.0 0.0
2010 8492 0.0 0.0 0.0
2011 8723 0.0 0.0 0.0
2012 8707 0.0 0.0 0.0
2013 8700 0.0 0.0 0.0
2014 8696 0.0 0.0 0.0
2015 8590 0.0 0.0 0.0
2016 8723 0.0 0.0 0.0
2017 8064 0.0 0.0 0.0
2018 8697 0.0 0.0 0.0
2019 7808 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References