X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375040116020

Well Details

Well ID: 0375040116020
Loading map...
Location: 02/16-01-037-04W5/0
Location Alias: 02/16-01-37-04 W5M
Location Alias 2: 02/16-01-037-04 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 01
County/Municipality: Red Deer County
Well Name: WHITECAP HZ 102 GARR 16-1-37-4
Operator Name: Whitecap Resources Inc.
License Number: 0435780
License Date: 2011-08-05
License Status: Issued
Spud Date: 2011-09-07
Final Drill Date: 2011-09-19
Well Total Depth: 3301.00 m
Surface Hole Latitude: 52.145075
Surface Hole Longitude: -114.429154

For data sources see[1][2]

Well History

Date Event
2011-08-05 Obtained License
2011-09-09 Surface Casing Operation Performed
2011-09-11 Well Log Performed
2011-09-13 Direction Drilling Operation Performed - Horizontal
2011-09-18 Well Log Performed
2011-09-19 Finished Drilling
2011-09-19 Production Casing Operation Performed
2011-09-19 Well Mode changed to Drilled and Cased
2011-09-20 Rig Released
2011-09-23 Well Log Performed
2011-09-26 Perforation Treatment Performed - Jet Perforation
2011-09-26 Well Log Performed
2011-09-30 Perforation Treatment Performed - Jet Perforation
2011-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-30 Well Log Performed
2011-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-03 Well Log Performed
2011-10-17 Well Began Production
2011-10-17 Well Fluid changed to Crude Oil
2011-10-17 Well Mode changed to Pumping
2011-11-23 Perforation Treatment Performed - Jet Perforation
2011-11-23 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-13 1402.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-26 Perforation 3270.00 3270.50 3
2011-09-30 Multi-Stage Fracture 3203.00 3203.50 0
2011-09-30 Multi-Stage Fracture 3136.00 3136.50 0
2011-09-30 Multi-Stage Fracture 3069.00 3069.50 0
2011-09-30 Multi-Stage Fracture 3002.00 3002.50 0
2011-09-30 Multi-Stage Fracture 2935.00 2935.50 0
2011-09-30 Multi-Stage Fracture 2868.00 2868.50 0
2011-09-30 Multi-Stage Fracture 2801.00 2801.50 0
2011-09-30 Perforation 2734.00 2734.50 3
2011-09-30 Perforation 2667.00 2667.50 3
2011-09-30 Perforation 2600.00 2600.50 3
2011-09-26 Perforation 3203.00 3203.50 3
2011-09-30 Perforation 2533.00 2533.50 3
2011-09-30 Perforation 2466.00 2466.50 3
2011-09-30 Perforation 2399.00 2399.50 3
2011-09-30 Perforation 2332.00 2332.50 3
2011-10-01 Multi-Stage Fracture 2734.00 2734.50 0
2011-10-01 Multi-Stage Fracture 2667.00 2667.50 0
2011-10-01 Multi-Stage Fracture 2600.00 2600.50 0
2011-10-01 Multi-Stage Fracture 2533.00 2533.50 0
2011-10-01 Multi-Stage Fracture 2466.00 2466.50 0
2011-10-01 Multi-Stage Fracture 2399.00 2399.50 0
2011-09-26 Perforation 3136.00 3136.50 3
2011-10-01 Multi-Stage Fracture 2332.00 2332.50 0
2011-11-23 Multi-Stage Fracture 2734.00 2734.50 0
2011-11-23 Multi-Stage Fracture 2667.00 2667.50 0
2011-11-23 Multi-Stage Fracture 2600.00 2600.50 0
2011-11-23 Multi-Stage Fracture 2533.00 2533.50 0
2011-11-23 Multi-Stage Fracture 2466.00 2466.50 0
2011-11-23 Multi-Stage Fracture 2399.00 2399.50 0
2011-11-23 Multi-Stage Fracture 2332.00 2332.50 0
2011-11-23 Perforation 2290.00 2290.50 3
2011-11-23 Perforation 2220.00 2220.50 3
2011-09-26 Perforation 3069.00 3069.50 3
2011-11-23 Perforation 2150.00 2150.50 3
2011-11-23 Multi-Stage Fracture 2290.00 2290.50 0
2011-11-23 Multi-Stage Fracture 2220.00 2220.50 0
2011-11-23 Multi-Stage Fracture 2150.00 2150.50 0
2011-09-26 Perforation 3002.00 3002.50 3
2011-09-26 Perforation 2935.00 2935.50 3
2011-09-26 Perforation 2868.00 2868.50 3
2011-09-26 Perforation 2801.00 2801.50 3
2011-09-30 Multi-Stage Fracture 3270.00 3270.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1250 0.0 0.0 0.0
2012 8757 0.0 0.0 0.0
2013 8456 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8735 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 8479 0.0 0.0 0.0
2020 2163 0.0 0.0 0.0

For data sources see[6]

References