X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375041914002

Well Details

Well ID: 0375041914002
Loading map...
Location: 00/14-19-037-04W5/2
Location Alias: 00/14-19-37-04 W5M
Location Alias 2: 00/14-19-037-04 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 19
County/Municipality: Clearwater County
Well Name: DEKALB ET AL SYLAKE 14-19-37-4
Operator Name: NAL Resources Limited
License Number: 0102332
License Date: 1983-07-22
License Status: Suspension
Spud Date: 1983-07-26
Final Drill Date: 1983-08-18
Well Total Depth: 2525.00 m
Surface Hole Latitude: 52.199419
Surface Hole Longitude: -114.561899

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-07-22 Obtained License
1983-08-18 Finished Drilling
1983-08-19 Drill Stem Test Performed
1983-08-21 Production Casing Operation Performed
1983-09-14 Perforation Treatment Performed - Jet Perforation
1983-09-15 Perforation Treatment Performed - Fractured
1983-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-09-24 Plug Back Performed
1983-09-26 Perforation Treatment Performed - Jet Perforation
1983-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-10-09 Perforation Treatment Performed - Jet Perforation
1983-10-14 Perforation Treatment Performed - Cement Squeeze
1983-10-16 Perforation Treatment Performed - Jet Perforation
1983-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-01 Perforation Treatment Performed - Fractured
1983-12-03 Well Log Performed
1983-12-04 Perforation Treatment Performed - Jet Perforation
1984-01-20 Perforation Treatment Performed - Fractured
1984-01-21 Well Log Performed
1984-02-29 Well Log Performed
1984-03-01 Perforation Treatment Performed - Jet Perforation
1984-03-05 Perforation Treatment Performed - Fractured
1984-06-08 Perforation Treatment Performed - Cement Squeeze
1985-07-07 Perforation Treatment Performed - Jet Perforation
1985-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-21 Perforation Treatment Performed - Fractured
1985-07-23 Well Log Performed
1986-08-22 Perforation Treatment Performed - Jet Perforation
1986-08-26 Perforation Treatment Performed - Cement Squeeze
1986-08-26 Plug Back Performed
1986-09-02 Perforation Treatment Performed - Jet Perforation
1986-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-03 Perforation Treatment Performed - Cement Squeeze
1986-10-03 Plug Back Performed
1986-10-08 Perforation Treatment Performed - Jet Perforation
1986-10-08 Well Log Performed
1986-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-30 Well Log Performed
1986-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-11-27 Well Mode changed to Drilled and Cased
1988-11-01 Well Began Production
1988-11-01 Well Fluid changed to Gas
1988-11-01 Well Mode changed to Flowing
2008-07-01 Well Fluid changed to Gas
2008-07-01 Well Mode changed to Pumping
2012-10-01 Well Fluid changed to Gas
2012-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-14 Perforation 2484.00 2487.00 13
1983-10-18 Acid Treatment 2422.50 2428.00 0
1983-11-01 Fracture 2422.50 2428.00 0
1983-12-04 Perforation 2408.00 2412.50 13
1984-01-20 Fracture 2408.00 2412.50 0
1984-03-01 Perforation 2186.00 2189.00 13
1984-03-05 Fracture 2186.00 2189.00 0
1984-06-08 Cement Squeeze 2186.00 2189.00 0
1985-07-07 Perforation 2374.50 2378.00 13
1985-07-07 Perforation 2380.00 2385.00 13
1985-07-11 Acid Treatment 2374.50 2385.00 0
1983-09-15 Fracture 2484.00 2487.00 0
1985-07-21 Fracture 2374.50 2385.00 0
1986-08-22 Perforation 2467.50 2469.00 13
1986-08-26 Cement Squeeze 2467.50 2469.00 0
1986-09-02 Perforation 2484.00 2487.00 13
1986-09-08 Acid Treatment 2484.00 2487.00 0
1986-10-03 Cement Squeeze 2484.00 2487.00 0
1986-10-08 Perforation 2484.00 2487.00 13
1986-10-09 Acid Treatment 2484.00 2487.00 0
1986-10-31 Packing Device Capped w/Cement 2449.00 2457.00 0
1983-09-24 Packing Device Capped w/Cement 2476.00 2480.00 0
1983-09-26 Perforation 2467.50 2469.00 13
1983-09-27 Acid Treatment 2467.50 2469.00 0
1983-10-07 Packing Device Capped w/Cement 2452.00 2460.00 0
1983-10-09 Perforation 2431.50 2434.50 13
1983-10-14 Cement Squeeze 2431.50 2434.50 0
1983-10-16 Perforation 2422.50 2428.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1055 0.0 0.0 0.0
1989 4884 0.0 0.0 0.0
1990 5658 0.0 0.0 0.0
1991 5145 0.0 0.0 0.0
1992 7690 0.0 0.0 0.0
1993 8413 0.0 0.0 0.0
1994 8551 0.0 0.0 0.0
1995 8700 0.0 0.0 0.0
1996 8419 0.0 0.0 0.0
1997 8644 0.0 0.0 0.0
1998 8751 0.0 0.0 0.0
1999 8154 0.0 0.0 0.0
2000 8735 0.0 0.0 0.0
2001 8683 0.0 0.0 0.0
2002 8624 0.0 0.0 0.0
2003 8599 0.0 0.0 0.0
2004 8771 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8731 0.0 0.0 0.0
2007 8416 0.0 0.0 0.0
2008 8592 0.0 0.0 0.0
2009 8639 0.0 0.0 0.0
2010 6862 0.0 0.0 0.0
2011 1533 0.0 0.0 0.0

For data sources see[5]

References