X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375093110000

Well Details

Well ID: 0375093110000
Loading map...
Location: 00/10-31-037-09W5/0
Location Alias: 00/10-31-37-09 W5M
Location Alias 2: 00/10-31-037-09 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 09
Section: 31
County/Municipality: Clearwater County
Well Name: NAL FERRIER 10-31-37-9
Operator Name: NAL Resources Limited
License Number: 0033954
License Date: 1968-04-03
License Status: Suspension
Spud Date: 1968-04-10
Final Drill Date: 1968-08-14
Well Total Depth: 4551.90 m
Surface Hole Latitude: 52.224900
Surface Hole Longitude: -115.270620

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-04-03 Obtained License
1968-04-10 Lost Circulation Occurred
1968-06-12 Drill Stem Test Performed
1968-07-15 Lost Circulation Occurred
1968-07-25 Well Log Performed
1968-07-26 Drill Stem Test Performed
1968-08-02 Drill Stem Test Performed
1968-08-14 Finished Drilling
1968-08-23 Liner Casing Operation Performed
1968-08-31 Perforation Treatment Performed - Jet Perforation
1968-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-15 Perforation Treatment Performed - Bullet Perforation
1968-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-23 Perforation Treatment Performed - Cement Squeeze
1968-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-24 Perforation Treatment Performed - Cement Squeeze
1968-09-25 Perforation Treatment Performed - Acid Wash - No Pressure
1968-09-26 Perforation Treatment Performed - Jet Perforation
1968-09-29 Perforation Treatment Performed - Cement Squeeze
1968-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-04 Perforation Treatment Performed - Cement Squeeze
1968-10-17 Perforation Treatment Performed - Jet Perforation
1968-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-11-03 Well Mode changed to Drilled and Cased
1971-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-02-05 Well Began Production
1972-02-05 Well Fluid changed to Gas
1972-02-05 Well Mode changed to Flowing
1999-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-05-30 Plug Back Performed
1999-05-30 Well Fluid changed to Gas
1999-05-30 Well Mode changed to Abandoned and Whipstocked
1999-06-04 Well Log Performed
1999-06-06 Well Log Performed
1999-06-07 Well Log Performed
1999-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-12-15 Well Log Performed
2004-12-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-08-31 Perforation 4489.70 4497.30 7
1968-09-25 Acid Wash 4184.00 4184.90 0
1968-09-26 Perforation 4143.10 4144.10 7
1968-09-29 Cement Squeeze 4143.10 4144.10 0
1968-10-04 Acid Treatment 4143.10 4144.10 0
1968-10-04 Cement Squeeze 4143.10 4144.10 0
1968-10-17 Perforation 4166.30 4177.00 0
1968-10-19 Acid Treatment 4166.30 4177.00 0
1968-10-21 Acid Treatment 4166.30 4177.00 0
1968-10-27 Acid Treatment 4166.30 4177.00 0
1971-03-09 Acid Treatment 4166.30 4177.00 0
1968-09-03 Acid Treatment 4489.70 4497.30 0
1999-05-30 Packing Device Capped w/Cement 3889.00 3897.00 0
1999-06-08 Packing Device Capped w/Cement 3744.00 3752.00 0
1968-09-04 Acid Treatment 4489.70 4497.30 0
1968-09-15 Bullet Perforation 4184.00 4184.90 7
1968-09-21 Acid Treatment 4184.00 4184.90 0
1968-09-23 Acid Treatment 4184.00 4184.90 0
1968-09-23 Cement Squeeze 4184.00 4184.90 0
1968-09-24 Acid Treatment 4184.00 4184.90 0
1968-09-24 Cement Squeeze 4184.00 4184.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 161 0.0 0.0 0.0
1972 7590 0.0 0.0 0.0
1973 8294 0.0 0.0 0.0
1974 8640 0.0 0.0 0.0
1975 8392 0.0 0.0 0.0
1976 8633 0.0 0.0 0.0
1977 8221 0.0 0.0 0.0
1978 8361 0.0 0.0 0.0
1979 7065 0.0 0.0 0.0
1980 7950 0.0 0.0 0.0
1981 7597 0.0 0.0 0.0
1982 8356 0.0 0.0 0.0
1983 8652 0.0 0.0 0.0
1984 8070 0.0 0.0 0.0
1985 8211 0.0 0.0 0.0
1986 6798 0.0 0.0 0.0
1987 7520 0.0 0.0 0.0
1988 7896 0.0 0.0 0.0
1989 7585 0.0 0.0 0.0
1990 7743 0.0 0.0 0.0
1991 7651 0.0 0.0 0.0
1992 7483 0.0 0.0 0.0
1993 6330 0.0 0.0 0.0
1994 6220 0.0 0.0 0.0
1995 1936 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1968-04-10 Lost Circulation 17.60 17.60
1968-07-15 Lost Circulation 3447.20 3447.20

For data sources see[6]

References