X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384011708030

Well Details

Well ID: 0384011708030
Loading map...
Location: 03/08-17-038-01W4/0
Location Alias: 03/08-17-38-01 W4M
Location Alias 2: 03/08-17-038-01 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 01
Section: 17
County/Municipality: Municipal District of Provost No. 52
Well Name: PCP 8B PROVOST 8-17-38-1
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0193088
License Date: 1996-11-05
License Status: Suspension
Spud Date: 1996-11-12
Final Drill Date: 1996-11-22
Well Total Depth: 874.00 m
Surface Hole Latitude: 52.266072
Surface Hole Longitude: -110.108196

For data sources see[1][2]

Well History

Date Event
1996-11-05 Obtained License
1996-11-12 Direction Drilling Operation Performed - Deviate
1996-11-12 Surface Casing Operation Performed
1996-11-22 Finished Drilling
1996-11-22 Production Casing Operation Performed
1996-11-22 Rig Released
1996-11-22 Well Log Performed
1996-11-22 Well Mode changed to Drilled and Cased
1996-12-15 Well Log Performed
1997-02-24 Perforation Treatment Performed - Jet Perforation
1997-02-24 Well Log Performed
1997-03-13 Well Began Production
1997-03-13 Well Fluid changed to Crude Oil
1997-03-13 Well Mode changed to Pumping
1998-05-31 Well Fluid changed to Crude Oil
1998-05-31 Well Mode changed to Suspended
2000-06-17 Well Fluid changed to Crude Oil
2000-06-17 Well Mode changed to Pumping
2001-05-31 Well Fluid changed to Crude Oil
2001-05-31 Well Mode changed to Suspended
2003-10-17 Well Fluid changed to Crude Oil
2003-10-17 Well Mode changed to Pumping
2011-09-01 Well Fluid changed to Crude Oil
2011-09-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-11-12 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-02-24 Perforation 820.00 827.00 30

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 927 0.0 0.0 0.0
1998 3522 0.0 0.0 0.0
2000 3373 0.0 0.0 0.0
2003 38 0.0 0.0 0.0
2007 594 0.0 0.0 0.0

For data sources see[6]

References