X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384030503B00

Well Details

Well ID: 0384030503B00
Loading map...
Location: B0/03-05-038-03W4/0
Location Alias: B0/03-05-38-03 W4M
Location Alias 2: B0/03-05-038-03 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 03
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 1B0 PROVOST 3-5-38-3
Operator Name: West Lake Energy Corp.
License Number: 0146423
License Date: 1990-11-21
License Status: Issued
Spud Date: 1990-11-30
Final Drill Date: 1990-12-04
Well Total Depth: 923.00 m
Surface Hole Latitude: 52.234058
Surface Hole Longitude: -110.403790

For data sources see[1][2]

Well History

Date Event
1990-11-21 Obtained License
1990-11-30 Surface Casing Operation Performed
1990-12-01 Direction Drilling Operation Performed - Deviate
1990-12-04 Finished Drilling
1990-12-04 Well Log Performed
1990-12-04 Well Mode changed to Drilled and Cased
1990-12-05 Production Casing Operation Performed
1990-12-05 Rig Released
1990-12-06 Well Log Performed
1991-01-05 Well Log Performed
1991-01-11 Perforation Treatment Performed - Jet Perforation
1991-01-11 Well Log Performed
1991-01-12 Well Began Production
1991-01-12 Well Fluid changed to Crude Oil
1991-01-12 Well Mode changed to Pumping
1995-02-28 Perforation Treatment Performed - Jet Perforation
1995-02-28 Well Log Performed
1997-03-17 Well Fluid changed to Crude Oil
1997-03-17 Well Mode changed to Suspended
1997-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-20 Perforation Treatment Performed - Jet Perforation
1997-08-20 Plug Back Performed
1997-08-20 Well Fluid changed to Crude Oil
1997-08-20 Well Log Performed
1997-08-20 Well Mode changed to Abandoned Zone
1997-08-23 Well Log Performed
1998-03-31 Perforation Treatment Performed - Cement Squeeze
1998-03-31 Perforation Treatment Performed - Jet Perforation
1998-04-01 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-12-01 230.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-01-11 Perforation 884.00 887.20 13
1995-02-28 Perforation 883.50 887.00 13
1997-08-20 Packing Device Capped w/Cement 870.00 878.00 0
1997-08-20 Perforation 829.00 846.00 18
1998-03-31 Perforation 884.00 887.20 13
1998-03-31 Perforation 883.50 887.00 13
1998-03-31 Cement Squeeze 883.50 887.20 0
1998-04-01 Fracture 829.00 846.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 6931 0.0 0.0 0.0
1992 8296 0.0 0.0 0.0
1993 7777 0.0 0.0 0.0
1994 8479 0.0 0.0 0.0
1995 7203 0.0 0.0 0.0
1996 1519 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-11 No Incident Encountered 0.00 0.00
1998-04-03 No Incident Encountered 0.00 0.00

For data sources see[7]

References