If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384102814000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.300651,"lon":-111.376021,"icon":""}]} |
Location: 00/14-28-038-10W4/0 | |
Location Alias: 00/14-28-38-10 W4M | |
Location Alias 2: 00/14-28-038-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 10 | |
Section: 28 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: ACL PROVOST 14-28-38-10 | |
Operator Name: Battle River Energy Ltd. | |
License Number: 0423960 | |
License Date: 2010-09-27 | |
License Status: Issued | |
Spud Date: 2010-10-04 | |
Final Drill Date: 2010-10-06 | |
Well Total Depth: 988.00 m | |
Surface Hole Latitude: 52.300651 | |
Surface Hole Longitude: -111.376021 |
Date | Event |
---|---|
2010-09-27 | Obtained License |
2010-10-04 | Surface Casing Operation Performed |
2010-10-06 | Finished Drilling |
2010-10-06 | Production Casing Operation Performed |
2010-10-06 | Well Log Performed |
2010-10-06 | Well Mode changed to Drilled and Cased |
2010-10-07 | Rig Released |
2010-10-12 | Well Log Performed |
2010-10-20 | Perforation Treatment Performed - Jet Perforation |
2010-10-20 | Well Log Performed |
2011-02-07 | Well Began Production |
2011-02-07 | Well Fluid changed to Crude Oil |
2011-02-07 | Well Mode changed to Pumping |
2015-06-03 | Perforation Treatment Performed - Chemical Squeeze |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-10-20 | Perforation | 961.00 | 963.00 | 17 |
2010-10-20 | Perforation | 964.00 | 966.00 | 17 |
2015-06-03 | Chemical Squeeze | 961.00 | 966.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7223 | 0.0 | 0.0 | 0.0 |
2012 | 8701 | 0.0 | 0.0 | 0.0 |
2013 | 7866 | 0.0 | 0.0 | 0.0 |
2014 | 120 | 0.0 | 0.0 | 0.0 |
2015 | 4439 | 0.0 | 0.0 | 0.0 |
2016 | 6936 | 0.0 | 0.0 | 0.0 |
2017 | 8675 | 0.0 | 0.0 | 0.0 |
2018 | 8198 | 0.0 | 0.0 | 0.0 |
2019 | 7460 | 0.0 | 0.0 | 0.0 |
2020 | 2160 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-06-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]