X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384103209000

Well Details

Well ID: 0384103209000
Loading map...
Location: 00/09-32-038-10W4/0
Location Alias: 00/09-32-38-10 W4M
Location Alias 2: 00/09-32-038-10 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 10
Section: 32
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 9-32-38-10
Operator Name: Karve Energy Inc.
License Number: 0148916
License Date: 1991-05-21
License Status: Issued
Spud Date: 1991-05-30
Final Drill Date: 1991-06-02
Well Total Depth: 1010.00 m
Surface Hole Latitude: 52.310696
Surface Hole Longitude: -111.388159

For data sources see[1][2]

Well History

Date Event
1991-05-21 Obtained License
1991-05-31 Surface Casing Operation Performed
1991-06-02 Finished Drilling
1991-06-02 Well Log Performed
1991-06-02 Well Mode changed to Drilled and Cased
1991-06-03 Production Casing Operation Performed
1991-06-03 Rig Released
1991-07-11 Perforation Treatment Performed - Jet Perforation
1991-07-11 Well Log Performed
1991-07-16 Well Began Production
1991-07-16 Well Fluid changed to Crude Oil
1991-07-16 Well Mode changed to Pumping
1994-03-12 Perforation Treatment Performed - Jet Perforation
1994-03-13 Well Log Performed
1994-03-18 Perforation Treatment Performed - Jet Perforation
1994-03-18 Well Log Performed
1998-10-30 Well Fluid changed to Crude Oil
1998-10-30 Well Mode changed to Suspended
2001-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-19 Perforation Treatment Performed - Jet Perforation
2001-03-19 Plug Back Performed
2001-03-19 Well Fluid changed to Crude Oil
2001-03-19 Well Log Performed
2001-03-19 Well Mode changed to Abandoned Zone
2001-04-21 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-07-11 Perforation 954.50 958.00 13
1994-03-12 Perforation 959.00 960.00 13
1994-03-18 Perforation 950.00 951.00 13
2001-03-19 Packing Device Capped w/Cement 932.00 940.00 0
2001-03-19 Perforation 816.00 819.00 17
2001-04-21 Fracture 816.00 819.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 1868 0.0 0.0 0.0
1992 932 0.0 0.0 0.0
1993 7173 0.0 0.0 0.0
1994 7515 0.0 0.0 0.0
1995 8396 0.0 0.0 0.0
1996 2547 0.0 0.0 0.0

For data sources see[5]

References