X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384121509000

Well Details

Well ID: 0384121509000
Loading map...
Location: 00/09-15-038-12W4/0
Location Alias: 00/09-15-38-12 W4M
Location Alias 2: 00/09-15-038-12 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 12
Section: 15
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 9-15-38-12
Operator Name: Karve Energy Inc.
License Number: 0438037
License Date: 2011-10-26
License Status: Issued
Spud Date: 2012-02-19
Final Drill Date: 2012-02-24
Well Total Depth: 1595.00 m
Surface Hole Latitude: 52.270609
Surface Hole Longitude: -111.638510

For data sources see[1][2]

Well History

Date Event
2011-10-26 Obtained License
2012-02-20 Surface Casing Operation Performed
2012-02-20 Well Log Performed
2012-02-21 Direction Drilling Operation Performed - Horizontal
2012-02-22 Intermediate Casing Operation Performed
2012-02-24 Finished Drilling
2012-02-24 Well Mode changed to Drilled and Cased
2012-02-25 Liner Casing Operation Performed
2012-02-25 Perforation Treatment Performed - Open-Hole Completion
2012-02-25 Rig Released
2012-02-27 Well Log Performed
2012-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-02 Well Began Production
2012-03-02 Well Fluid changed to Crude Oil
2012-03-02 Well Mode changed to Pumping
2019-06-01 Well Began Injection
2019-06-01 Well Fluid changed to Water
2019-06-01 Well Type changed to Injection

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-19 Trinidad Drilling Ltd. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-21 565.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-25 Open Hole/Barefoot Completion 1570.00 1595.00 0
2012-03-02 Multi-Stage Fracture 1233.00 1233.10 0
2012-03-02 Multi-Stage Fracture 1194.00 1194.10 0
2012-03-02 Multi-Stage Fracture 1144.00 1144.10 0
2012-03-02 Multi-Stage Fracture 1105.00 1105.10 0
2012-03-02 Multi-Stage Fracture 1077.00 1077.10 0
2012-03-02 Multi-Stage Fracture 1554.00 1554.10 0
2012-03-02 Multi-Stage Fracture 1526.00 1526.10 0
2012-03-02 Multi-Stage Fracture 1487.00 1487.10 0
2012-03-02 Multi-Stage Fracture 1449.00 1449.10 0
2012-03-02 Multi-Stage Fracture 1410.00 1410.10 0
2012-03-02 Multi-Stage Fracture 1371.00 1371.10 0
2012-03-02 Multi-Stage Fracture 1332.00 1332.10 0
2012-03-02 Multi-Stage Fracture 1294.00 1294.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6841 0.0 0.0 0.0
2013 8291 0.0 0.0 0.0
2014 8429 0.0 0.0 0.0
2015 8657 0.0 0.0 0.0
2016 8418 0.0 0.0 0.0
2017 8132 0.0 0.0 0.0
2018 7451 0.0 0.0 0.0
2019 960 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-10 No Incident Encountered 0.00 0.00
2019-05-04 No Incident Encountered 0.00 0.00

For data sources see[8]

References