X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384122102020

Well Details

Well ID: 0384122102020
Loading map...
Location: 02/02-21-038-12W4/0
Location Alias: 02/02-21-38-12 W4M
Location Alias 2: 02/02-21-038-12 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 12
Section: 21
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 2-21-38-12
Operator Name: Karve Energy Inc.
License Number: 0435438
License Date: 2011-07-25
License Status: Issued
Spud Date: 2011-08-15
Final Drill Date: 2011-08-18
Well Total Depth: 1501.00 m
Surface Hole Latitude: 52.277649
Surface Hole Longitude: -111.649172

For data sources see[1][2]

Well History

Date Event
2011-07-25 Obtained License
2011-08-15 Well Log Performed
2011-08-16 Surface Casing Operation Performed
2011-08-16 Well Log Performed
2011-08-17 Direction Drilling Operation Performed - Horizontal
2011-08-17 Well Log Performed
2011-08-18 Finished Drilling
2011-08-18 Well Log Performed
2011-08-18 Well Mode changed to Drilled and Cased
2011-08-19 Production Casing Operation Performed
2011-08-19 Rig Released
2011-09-14 Well Log Performed
2011-09-17 Well Log Performed
2011-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-25 Well Log Performed
2011-10-28 Well Began Production
2011-10-28 Well Fluid changed to Crude Oil
2011-10-28 Well Mode changed to Flowing
2013-07-07 Perforation Treatment Performed - Jet Perforation
2013-07-08 Perforation Treatment Performed - Fractured
2013-11-21 Well Log Performed
2013-11-22 Well Log Performed
2014-03-01 Well Began Injection
2014-03-01 Well Fluid changed to Water
2014-03-01 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-17 610.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-25 Multi-Stage Fracture 1021.00 1021.20 0
2011-09-25 Multi-Stage Fracture 1415.00 1415.20 0
2011-09-25 Multi-Stage Fracture 1450.00 1450.20 0
2011-09-25 Multi-Stage Fracture 1485.00 1485.20 0
2013-07-07 Perforation 1460.00 1460.50 17
2013-07-07 Perforation 1425.00 1425.50 17
2013-07-07 Perforation 1389.00 1389.50 17
2013-07-07 Perforation 1361.50 1362.00 17
2013-07-07 Perforation 1327.00 1327.50 17
2013-07-07 Perforation 1287.20 1287.70 17
2013-07-07 Perforation 1206.00 1206.50 17
2011-09-25 Multi-Stage Fracture 1055.00 1055.20 0
2013-07-07 Perforation 1171.50 1172.00 17
2013-07-07 Perforation 1129.50 1130.00 17
2013-07-07 Perforation 1094.50 1095.00 17
2013-07-07 Perforation 1053.50 1054.00 17
2013-07-07 Perforation 1017.50 1018.00 17
2013-07-08 Fracture 1361.50 1362.00 0
2013-07-08 Fracture 1327.00 1327.50 0
2013-07-08 Fracture 1287.20 1287.70 0
2013-07-08 Fracture 1206.00 1206.50 0
2013-07-08 Fracture 1171.50 1172.00 0
2011-09-25 Multi-Stage Fracture 1095.00 1095.20 0
2013-07-08 Fracture 1129.50 1130.00 0
2013-07-08 Fracture 1094.50 1095.00 0
2013-07-08 Fracture 1053.50 1054.00 0
2013-07-08 Fracture 1017.50 1018.00 0
2011-09-25 Multi-Stage Fracture 1130.00 1130.20 0
2011-09-25 Multi-Stage Fracture 1170.00 1170.20 0
2011-09-25 Multi-Stage Fracture 1210.00 1210.20 0
2011-09-25 Multi-Stage Fracture 1305.00 1305.20 0
2011-09-25 Multi-Stage Fracture 1345.00 1345.20 0
2011-09-25 Multi-Stage Fracture 1380.00 1380.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-07-08 2013-07-08 852 248 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 70.1637 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 13.7659 N/A
Breaker-F Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0189 N/A
Buff 75 Fusion Technologies Inc. Buffer Formic Acid 992-98-3 100 0.1409 N/A
IH-CS-1B Fusion Technologies Inc. Clay Control Non hazerdous ingridients 64-18-6 100 0.0685 N/A
IH-CZX-2 Fusion Technologies Inc. Crosslinker Alkanolamine chelate of zirconium alkoxide 197980-53-3 100 0.0463 N/A
Methanol 67-56-1 100 0.0463 N/A
N-propanol 71-23-8 100 0.0463 N/A
Nitrogen Iron Horse Energy Services Energizing Fluid nitrogen 7727-37-9 100 1.8405 N/A
IH-GA-3 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.289 N/A
IH-NE-1 Fusion Technologies Inc. Surfactant 1.2.4-trimethylbenzene 95-63-6 100 0.1044 N/A
2-ethyhexanol 104-76-7 100 0.1044 N/A
EO-C7-9-iso. C8-rich alcohols 78330-19-5 100 0.1044 N/A
EO-C9-11-iso. C10-rich alcohols 78330-20-8 100 0.1044 N/A
Heavy aromatic naptha 64742-94-5 100 0.1044 N/A
Isopropanol 67-63-0 100 0.1044 N/A
Methanol 67-56-1 100 0.1044 N/A
Napthalene 91-20-3 100 0.1044 N/A
Polyethylene glycol 25322-68-3 100 0.1044 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-07-05 2013-07-05 Municipal Water 260

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1501 0.0 0.0 0.0
2012 4684 0.0 0.0 0.0
2013 2588 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-09-25 No Incident Encountered 0.00 0.00
2013-07-13 No Incident Encountered 0.00 0.00
2013-11-25 No Incident Encountered 0.00 0.00

For data sources see[9]

References