If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0384122103020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.274468,"lon":-111.682304,"icon":""}]} |
| Location: 02/03-21-038-12W4/0 | |
| Location Alias: 02/03-21-38-12 W4M | |
| Location Alias 2: 02/03-21-038-12 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 4 | |
| Range: 12 | |
| Section: 21 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: KARVE PROVOST 3-21-38-12 | |
| Operator Name: Karve Energy Inc. | |
| License Number: 0457350 | |
| License Date: 2013-06-05 | |
| License Status: Amended | |
| Spud Date: 2013-09-03 | |
| Final Drill Date: 2013-09-07 | |
| Well Total Depth: 2319.00 m | |
| Surface Hole Latitude: 52.274468 | |
| Surface Hole Longitude: -111.682304 |
| Date | Event |
|---|---|
| 2013-06-05 | Obtained License |
| 2013-09-04 | Surface Casing Operation Performed |
| 2013-09-05 | Direction Drilling Operation Performed - Deviate |
| 2013-09-05 | Direction Drilling Operation Performed - Horizontal |
| 2013-09-07 | Finished Drilling |
| 2013-09-07 | Production Casing Operation Performed |
| 2013-09-07 | Well Log Performed |
| 2013-09-07 | Well Mode changed to Drilled and Cased |
| 2013-09-08 | Rig Released |
| 2013-09-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-09-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-10-22 | Well Fluid changed to Crude Oil |
| 2013-10-22 | Well Mode changed to Drilling and Completing |
| 2013-12-01 | Well Began Production |
| 2013-12-01 | Well Fluid changed to Crude Oil |
| 2013-12-01 | Well Mode changed to Pumping |
| 2014-10-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2014-10-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-09-03 | Bonanza Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-09-05 | 625.70 | Deviate (5 - 79 degrees) |
| 2013-09-05 | 1078.80 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-09-24 | Multi-Stage Fracture | 2300.80 | 2304.80 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 1847.80 | 1851.80 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 1803.40 | 1807.40 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 1772.60 | 1776.50 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 1714.80 | 1718.70 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 1656.90 | 1660.80 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 1599.10 | 1603.00 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 1563.40 | 1567.30 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 1519.10 | 1523.00 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 1474.70 | 1478.60 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 1376.40 | 1380.40 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 2242.90 | 2246.90 | 0 |
| 2013-09-25 | Multi-Stage Fracture | 1345.60 | 1349.50 | 0 |
| 2013-09-25 | Multi-Stage Fracture | 1274.30 | 1278.20 | 0 |
| 2013-09-25 | Multi-Stage Fracture | 1229.90 | 1233.80 | 0 |
| 2013-09-25 | Multi-Stage Fracture | 1185.60 | 1189.50 | 0 |
| 2013-09-25 | Multi-Stage Fracture | 1127.70 | 1131.70 | 0 |
| 2013-09-25 | Multi-Stage Fracture | 1083.40 | 1087.30 | 0 |
| 2014-10-19 | Acid Treatment | 1963.40 | 1967.40 | 0 |
| 2014-10-19 | Acid Treatment | 1892.20 | 1896.10 | 0 |
| 2014-10-19 | Acid Treatment | 1847.80 | 1851.80 | 0 |
| 2014-10-19 | Acid Treatment | 1803.40 | 1807.40 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 2212.00 | 2216.00 | 0 |
| 2014-10-20 | Acid Treatment | 1772.60 | 1776.50 | 0 |
| 2014-10-20 | Acid Treatment | 1714.80 | 1718.70 | 0 |
| 2014-10-20 | Acid Treatment | 1656.90 | 1660.80 | 0 |
| 2014-10-20 | Acid Treatment | 1599.10 | 1603.00 | 0 |
| 2014-10-20 | Acid Treatment | 1563.40 | 1567.30 | 0 |
| 2014-10-20 | Acid Treatment | 1519.10 | 1523.00 | 0 |
| 2014-10-20 | Acid Treatment | 1474.70 | 1478.60 | 0 |
| 2014-10-20 | Acid Treatment | 1376.40 | 1380.40 | 0 |
| 2014-10-20 | Acid Treatment | 1345.60 | 1349.50 | 0 |
| 2014-10-20 | Acid Treatment | 1274.30 | 1278.20 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 2154.30 | 2158.20 | 0 |
| 2014-10-20 | Acid Treatment | 1229.90 | 1233.80 | 0 |
| 2014-10-20 | Acid Treatment | 1185.60 | 1189.50 | 0 |
| 2014-10-20 | Acid Treatment | 1127.70 | 1131.70 | 0 |
| 2014-10-20 | Acid Treatment | 1083.40 | 1087.30 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 2096.40 | 2100.40 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 2052.10 | 2056.10 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 2007.80 | 2011.80 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 1963.40 | 1967.40 | 0 |
| 2013-09-24 | Multi-Stage Fracture | 1892.20 | 1896.10 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-09-24 | 2013-09-25 | 893 | 494 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 57.7368 | N/A | |||
| FRAC SAND. 16/30 WHITE (OTTAWA TYPE) | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 21.7947 | N/A | ||
| FRAC SAND.70/140 OR 50/140 CANADIAN | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.4702 | N/A | ||
| CC-2 | Baker Hughes | Clay Control | Non-hazardous | Not Available | 100 | 0.1109 | N/A | |
| Nitrogen | Baker Hughes | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 18.3 | N/A | |
| FAC-1W | Baker Hughes | Gelling Agent | Isopropanol | 67-63-0 | 100 | 0.0839 | N/A | |
| N.N-Dimethyloctadecylamine | 124-28-7 | 100 | 0.0839 | N/A | ||||
| N.N-Dimethyloctadecylamine hydrochloride | 1613-17-8 | 100 | 0.0839 | N/A | ||||
| Trimethyloctadecylammonium chloride | 112-03-8 | 100 | 0.0839 | N/A | ||||
| FAC-3W | Baker Hughes | Gelling Agent | Isopropanol | 67-63-0 | 100 | 0.5032 | N/A | |
| Sodium xylene sulphonate | 1300-72-7 | 100 | 0.5032 | N/A | ||||
| Trimethyloctadecylammonium chloride | 112-03-8 | 100 | 0.5032 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-09-23 | 2013-09-23 | Municipal Water | 429 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 744 | 0.0 | 0.0 | 0.0 |
| 2014 | 8135 | 0.0 | 0.0 | 0.0 |
| 2015 | 8475 | 0.0 | 0.0 | 0.0 |
| 2016 | 8457 | 0.0 | 0.0 | 0.0 |
| 2017 | 8259 | 0.0 | 0.0 | 0.0 |
| 2018 | 7505 | 0.0 | 0.0 | 0.0 |
| 2019 | 2335 | 0.0 | 0.0 | 0.0 |
| 2020 | 2170 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-09-08 | No Incident Encountered | 0.00 | 0.00 |
| 2013-10-21 | No Incident Encountered | 0.00 | 0.00 |
| 2014-10-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]