X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384122107000

Well Details

Well ID: 0384122107000
Loading map...
Location: 00/07-21-038-12W4/0
Location Alias: 00/07-21-38-12 W4M
Location Alias 2: 00/07-21-038-12 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 12
Section: 21
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 7-21-38-12
Operator Name: Karve Energy Inc.
License Number: 0378045
License Date: 2007-06-12
License Status: Suspension
Spud Date: 2007-06-16
Final Drill Date: 2007-06-19
Well Total Depth: 883.00 m
Surface Hole Latitude: 52.280132
Surface Hole Longitude: -111.659155

For data sources see[1][2]

Well History

Date Event
2007-06-12 Obtained License
2007-06-16 Surface Casing Operation Performed
2007-06-19 Finished Drilling
2007-06-19 Well Log Performed
2007-06-19 Well Mode changed to Drilled and Cased
2007-06-20 Production Casing Operation Performed
2007-06-20 Rig Released
2007-07-24 Perforation Treatment Performed - Jet Perforation
2007-08-31 Perforation Treatment Performed - Fractured
2007-09-03 Perforation Treatment Performed - Jet Perforation
2007-09-05 Well Began Production
2007-09-05 Well Fluid changed to Crude Oil
2007-09-05 Well Mode changed to Pumping
2013-10-01 Well Fluid changed to Crude Oil
2013-10-01 Well Mode changed to Suspended
2019-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-28 Perforation Treatment Performed - Jet Perforation
2019-10-28 Plug Back Performed
2019-10-28 Well Fluid changed to Crude Oil
2019-10-28 Well Mode changed to Abandoned Zone
2020-02-01 Well Fluid changed to Water
2020-02-01 Well Type changed to Source

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-07-24 Perforation 856.00 860.00 17
2007-08-31 Fracture 856.00 860.00 0
2007-09-03 Perforation 871.00 872.50 17
2019-10-28 Packing Device Capped w/Cement 845.00 853.00 0
2019-10-28 Perforation 357.00 363.00 17
2019-10-28 Perforation 349.00 354.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 2810 0.0 0.0 0.0
2008 8592 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 5376 0.0 0.0 0.0
2020 1439 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References