X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384122206F13

Well Details

Well ID: 0384122206F13
Loading map...
Location: F1/06-22-038-12W4/3
Location Alias: F1/06-22-38-12 W4M
Location Alias 2: F1/06-22-038-12 W4/03
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 12
Section: 22
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 6-22-38-12
Operator Name: Karve Energy Inc.
License Number: 0171619
License Date: 1994-10-19
License Status: Suspension
Spud Date: 1994-09-20
Final Drill Date: 1994-09-21
Well Total Depth: 1055.50 m
Surface Hole Latitude: 52.278761
Surface Hole Longitude: -111.641047

For data sources see[1][2]

Well History

Date Event
1994-09-20 Perforation Treatment Performed - Jet Perforation
1994-09-21 Finished Drilling
1994-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-21 Perforation Treatment Performed - Cement Squeeze
1994-09-21 Plug Back Performed
1994-09-21 Well Mode changed to Drilled and Cased
1994-09-24 Perforation Treatment Performed - Jet Perforation
1994-09-25 Rig Released
1994-10-19 Obtained License
2005-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-20 Perforation Treatment Performed - Jet Perforation
2005-07-20 Plug Back Performed
2005-07-22 Perforation Treatment Performed - Jet Perforation
2005-07-26 Perforation Treatment Performed - Fractured
2005-08-01 Well Began Production
2005-08-01 Well Fluid changed to Crude Oil
2005-08-01 Well Mode changed to Pumping
2013-10-01 Well Fluid changed to Crude Oil
2013-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-09-20 Perforation 839.40 841.20 7
1994-09-21 Acid Treatment 839.40 841.20 0
1994-09-21 Cement Squeeze 839.40 841.20 0
1994-09-24 Perforation 971.40 975.30 13
2005-07-20 Packing Device Capped w/Cement 957.00 965.00 0
2005-07-20 Perforation 852.50 853.50 13
2005-07-22 Perforation 839.20 841.20 14
2005-07-26 Fracture 839.20 853.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 3288 0.0 0.0 0.0
2006 8399 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8759 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8615 0.0 0.0 0.0
2011 1550 0.0 0.0 0.0

For data sources see[5]

References