X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384122302000

Well Details

Well ID: 0384122302000
Loading map...
Location: 00/02-23-038-12W4/0
Location Alias: 00/02-23-38-12 W4M
Location Alias 2: 00/02-23-038-12 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 12
Section: 23
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 2-23-38-12
Operator Name: Karve Energy Inc.
License Number: 0438315
License Date: 2011-11-02
License Status: Issued
Spud Date: 2012-02-03
Final Drill Date: 2012-02-08
Well Total Depth: 1646.00 m
Surface Hole Latitude: 52.277957
Surface Hole Longitude: -111.599063

For data sources see[1][2]

Well History

Date Event
2011-11-02 Obtained License
2012-02-03 Surface Casing Operation Performed
2012-02-04 Well Log Performed
2012-02-05 Direction Drilling Operation Performed - Horizontal
2012-02-05 Intermediate Casing Operation Performed
2012-02-06 Well Log Performed
2012-02-07 Well Log Performed
2012-02-08 Finished Drilling
2012-02-08 Well Log Performed
2012-02-08 Well Mode changed to Drilled and Cased
2012-02-09 Liner Casing Operation Performed
2012-02-09 Perforation Treatment Performed - Open-Hole Completion
2012-02-09 Rig Released
2012-02-18 Well Log Performed
2012-02-22 Well Began Production
2012-02-22 Well Fluid changed to Crude Oil
2012-02-22 Well Mode changed to Flowing
2012-02-23 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-03 Bonanza Drilling Inc. 1 N/A Drill To LD
2012-02-03 Bonanza Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-05 505.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-09 Open Hole/Barefoot Completion 1630.00 1646.00 0
2012-02-23 Multi-Stage Fracture 1301.00 1301.10 0
2012-02-23 Multi-Stage Fracture 1262.00 1262.10 0
2012-02-23 Multi-Stage Fracture 1224.00 1224.10 0
2012-02-23 Multi-Stage Fracture 1196.00 1196.10 0
2012-02-23 Multi-Stage Fracture 1147.00 1147.10 0
2012-02-23 Multi-Stage Fracture 1096.00 1096.10 0
2012-02-23 Multi-Stage Fracture 1613.00 1613.10 0
2012-02-23 Multi-Stage Fracture 1585.00 1585.10 0
2012-02-23 Multi-Stage Fracture 1534.00 1534.10 0
2012-02-23 Multi-Stage Fracture 1506.00 1506.10 0
2012-02-23 Multi-Stage Fracture 1456.00 1456.10 0
2012-02-23 Multi-Stage Fracture 1429.00 1429.10 0
2012-02-23 Multi-Stage Fracture 1378.00 1378.10 0
2012-02-23 Multi-Stage Fracture 1351.00 1351.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6525 0.0 0.0 0.0
2013 8103 0.0 0.0 0.0
2014 8383 0.0 0.0 0.0
2015 8646 0.0 0.0 0.0
2016 8460 0.0 0.0 0.0
2017 8601 0.0 0.0 0.0
2018 8451 0.0 0.0 0.0
2019 7972 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[7]

References