X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384122316000

Well Details

Well ID: 0384122316000
Loading map...
Location: 00/16-23-038-12W4/0
Location Alias: 00/16-23-38-12 W4M
Location Alias 2: 00/16-23-038-12 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 12
Section: 23
County/Municipality: County of Paintearth No. 18
Well Name: ACL HZ PROVOST 16-23-38-12
Operator Name: Karve Energy Inc.
License Number: 0447478
License Date: 2012-07-31
License Status: Issued
Spud Date: 2012-08-24
Final Drill Date: 2012-08-30
Well Total Depth: 2543.00 m
Surface Hole Latitude: 52.285371
Surface Hole Longitude: -111.628798

For data sources see[1][2]

Well History

Date Event
2012-07-31 Obtained License
2012-08-24 Well Log Performed
2012-08-25 Direction Drilling Operation Performed - Deviate
2012-08-25 Surface Casing Operation Performed
2012-08-26 Direction Drilling Operation Performed - Horizontal
2012-08-27 Intermediate Casing Operation Performed
2012-08-27 Well Log Performed
2012-08-30 Finished Drilling
2012-08-30 Well Log Performed
2012-08-30 Well Mode changed to Drilled and Cased
2012-09-01 Liner Casing Operation Performed
2012-09-01 Perforation Treatment Performed - Open-Hole Completion
2012-09-02 Rig Released
2012-09-09 Well Log Performed
2012-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-14 Well Began Production
2012-10-14 Well Fluid changed to Crude Oil
2012-10-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-24 Trinidad Drilling Ltd. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-25 477.00 Deviate (5 - 79 degrees)
2012-08-26 983.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-01 Open Hole/Barefoot Completion 2538.00 2543.00 0
2012-09-18 Multi-Stage Fracture 2517.20 2517.30 0
2012-09-19 Multi-Stage Fracture 1244.10 1244.20 0
2012-09-19 Multi-Stage Fracture 1318.30 1318.40 0
2012-09-19 Multi-Stage Fracture 1392.20 1392.30 0
2012-09-19 Multi-Stage Fracture 1499.90 1500.00 0
2012-09-19 Multi-Stage Fracture 1596.40 1596.50 0
2012-09-18 Multi-Stage Fracture 1669.90 1670.00 0
2012-09-18 Multi-Stage Fracture 1777.60 1777.70 0
2012-09-18 Multi-Stage Fracture 1885.70 1885.80 0
2012-09-18 Multi-Stage Fracture 1993.90 1994.00 0
2012-09-18 Multi-Stage Fracture 2100.90 2101.00 0
2012-09-18 Multi-Stage Fracture 2197.70 2197.80 0
2012-09-18 Multi-Stage Fracture 2305.90 2306.00 0
2012-09-18 Multi-Stage Fracture 2415.10 2415.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1688 0.0 0.0 0.0
2013 8551 0.0 0.0 0.0
2014 8587 0.0 0.0 0.0
2015 8709 0.0 0.0 0.0
2016 5899 0.0 0.0 0.0
2017 2434 0.0 0.0 0.0
2018 3787 0.0 0.0 0.0
2019 7298 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-02 No Incident Encountered 0.00 0.00
2012-10-12 No Incident Encountered 0.00 0.00

For data sources see[8]

References