X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384140413002

Well Details

Well ID: 0384140413002
Loading map...
Location: 00/13-04-038-14W4/2
Location Alias: 00/13-04-38-14 W4M
Location Alias 2: 00/13-04-038-14 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 14
Section: 04
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVO 13-4-38-14
Operator Name: Karve Energy Inc.
License Number: B0002900
License Date: 1949-05-25
License Status: Abandoned
Spud Date: 1949-05-26
Final Drill Date: 1949-06-28
Well Total Depth: 1432.60 m
Surface Hole Latitude: 52.243228
Surface Hole Longitude: -111.954228

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-05-25 Obtained License
1949-06-07 Drill Stem Test Performed
1949-06-11 Production Casing Operation Performed
1949-06-21 Drill Stem Test Performed
1949-06-23 Drill Stem Test Performed
1949-06-25 Drill Stem Test Performed
1949-06-28 Finished Drilling
1963-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-03 Perforation Treatment Performed - Jet Perforation
1963-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-06 Well Mode changed to Drilled and Cased
1964-02-04 Well Began Production
1964-02-04 Well Fluid changed to Gas
1964-02-04 Well Mode changed to Flowing
1968-03-01 Well Fluid changed to Gas
1968-03-01 Well Mode changed to Suspended
1988-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-09-13 Plug Back Performed
1988-09-13 Well Fluid changed to Gas
1988-09-13 Well Mode changed to Abandoned Zone
1988-09-14 Perforation Treatment Performed - Jet Perforation
1988-09-14 Well Log Performed
1988-09-15 Perforation Treatment Performed - Fractured
1989-02-24 Perforation Treatment Performed - Jet Perforation
2012-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-03 Plug Back Performed
2012-06-04 Perforation Treatment Performed - Jet Perforation
2012-06-06 Perforation Treatment Performed - Cement Plug
2012-06-06 Perforation Treatment Performed - Cement Squeeze
2012-06-06 Plug Back Performed
2012-10-02 Well Abandoned
2012-10-02 Well Fluid changed to Gas
2012-10-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-10-03 Perforation 971.70 972.60 13
2012-06-03 Packing Device Capped w/Cement 942.00 950.00 0
2012-06-04 Perforation 384.00 385.00 13
2012-06-04 Perforation 249.00 250.00 13
2012-06-04 Perforation 194.00 195.00 13
2012-06-06 Cement Squeeze 194.00 195.00 0
2012-06-06 Cement Plug 170.00 405.00 0
1963-10-03 Perforation 1064.70 1065.90 13
1963-10-03 Acid Treatment 971.70 972.60 0
1963-10-06 Acid Treatment 1064.70 1065.90 0
1988-09-13 Packing Device Capped w/Cement 1042.00 1050.00 0
1988-09-14 Perforation 971.70 972.30 13
1988-09-14 Perforation 972.70 973.20 13
1988-09-15 Fracture 971.70 973.20 0
1989-02-24 Perforation 962.50 967.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1981 744 0.0 0.0 0.0
1982 2135 0.0 0.0 0.0
1983 381 0.0 0.0 0.0
1984 1268 0.0 0.0 0.0
1985 1475 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References