X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384141107003

Well Details

Well ID: 0384141107003
Loading map...
Location: 00/07-11-038-14W4/3
Location Alias: 00/07-11-38-14 W4M
Location Alias 2: 00/07-11-038-14 W4/03
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 14
Section: 11
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 7-11-38-14
Operator Name: Karve Energy Inc.
License Number: 0075471
License Date: 1979-05-03
License Status: Issued
Spud Date: 1979-05-15
Final Drill Date: 1979-05-22
Well Total Depth: 1121.00 m
Surface Hole Latitude: 52.249287
Surface Hole Longitude: -111.893216

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-05-03 Obtained License
1979-05-20 Drill Stem Test Performed
1979-05-22 Finished Drilling
1979-05-22 Well Mode changed to Drilled and Cased
1979-05-23 Drill Stem Test Performed
1979-05-24 Drill Stem Test Performed
1979-05-24 Production Casing Operation Performed
1979-06-21 Perforation Treatment Performed - Jet Perforation
1979-06-22 Perforation Treatment Performed - Jet Perforation
1991-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-09-14 Plug Back Performed
1991-09-14 Well Log Performed
1991-09-15 Perforation Treatment Performed - Jet Perforation
1991-10-01 Well Began Production
1991-10-01 Well Fluid changed to Gas
1991-10-01 Well Mode changed to Flowing
1999-03-07 Perforation Treatment Performed - Jet Perforation
1999-03-07 Well Fluid changed to Gas
1999-03-07 Well Log Performed
1999-03-07 Well Mode changed to Flowing
1999-06-09 Perforation Treatment Performed - Fractured
1999-08-06 Well Log Performed
2002-07-01 Well Fluid changed to Gas
2002-07-01 Well Mode changed to Pumping
2006-04-27 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-06-21 Perforation 1098.30 1099.30 13
1979-06-22 Perforation 1067.50 1071.50 7
1991-09-14 Packing Device Capped w/Cement 1081.50 1089.50 0
1991-09-15 Perforation 1012.00 1013.50 13
1999-03-07 Perforation 966.00 968.00 13
1999-03-07 Perforation 969.00 970.50 13
1999-06-09 Fracture 966.00 970.50 0
2006-04-27 Perforation 1098.30 1099.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 1576 0.0 0.0 0.0
1992 8423 0.0 0.0 0.0
1993 8704 0.0 0.0 0.0
1994 8572 0.0 0.0 0.0
1995 8516 0.0 0.0 0.0
1996 8478 0.0 0.0 0.0
1997 8617 0.0 0.0 0.0
1998 8361 0.0 0.0 0.0
1999 7920 0.0 0.0 0.0
2000 8630 0.0 0.0 0.0
2001 8263 0.0 0.0 0.0
2002 8507 0.0 0.0 0.0
2003 8510 0.0 0.0 0.0
2004 8779 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8347 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8701 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8592 0.0 0.0 0.0
2012 8615 0.0 0.0 0.0
2013 8624 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 8734 0.0 0.0 0.0
2016 8657 0.0 0.0 0.0
2017 8740 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8737 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[5]

References