X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384142603004

Well Details

Well ID: 0384142603004
Loading map...
Location: 00/03-26-038-14W4/4
Location Alias: 00/03-26-38-14 W4M
Location Alias 2: 00/03-26-038-14 W4/04
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 14
Section: 26
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 3-26-38-14
Operator Name: Karve Energy Inc.
License Number: 0270713
License Date: 2002-06-07
License Status: Issued
Spud Date: 2002-06-17
Final Drill Date: 2002-06-21
Well Total Depth: 1091.00 m
Surface Hole Latitude: 52.291652
Surface Hole Longitude: -111.903031

For data sources see[1][2]

Well History

Date Event
2002-06-07 Obtained License
2002-06-18 Surface Casing Operation Performed
2002-06-21 Finished Drilling
2002-06-21 Well Log Performed
2002-06-21 Well Mode changed to Drilled and Cased
2002-06-22 Production Casing Operation Performed
2002-06-22 Rig Released
2002-06-22 Well Log Performed
2002-06-27 Perforation Treatment Performed - Jet Perforation
2002-06-27 Well Log Performed
2002-07-13 Perforation Treatment Performed - Fractured
2002-07-20 Perforation Treatment Performed - Jet Perforation
2002-07-20 Well Log Performed
2002-07-21 Perforation Treatment Performed - Cement Squeeze
2002-07-21 Plug Back Performed
2002-07-24 Perforation Treatment Performed - Jet Perforation
2002-07-24 Well Log Performed
2004-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-16 Plug Back Performed
2004-09-16 Well Log Performed
2004-10-06 Perforation Treatment Performed - Fractured
2004-10-12 Perforation Treatment Performed - Jet Perforation
2004-10-12 Well Log Performed
2004-10-18 Perforation Treatment Performed - Fractured
2004-11-06 Well Began Production
2004-11-06 Well Fluid changed to Gas
2004-11-06 Well Mode changed to Flowing
2007-12-21 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-06-27 Perforation 1072.00 1074.00 17
2004-10-06 Fracture 957.00 958.50 0
2004-10-12 Perforation 916.50 919.00 17
2004-10-18 Fracture 916.50 919.00 0
2002-07-13 Fracture 1072.00 1074.00 0
2002-07-20 Perforation 1058.00 1060.00 17
2002-07-20 Perforation 1060.50 1062.00 17
2002-07-20 Perforation 1062.50 1063.50 17
2002-07-21 Cement Squeeze 1058.00 1063.50 0
2002-07-24 Perforation 957.00 958.50 17
2004-09-16 Packing Device Capped w/Cement 1062.00 1070.00 0
2004-09-16 Packing Device Capped w/Cement 1048.00 1056.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 721 0.0 0.0 0.0
2005 8753 0.0 0.0 0.0
2006 8280 0.0 0.0 0.0
2007 8450 0.0 0.0 0.0

For data sources see[5]

References