X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384142907022

Well Details

Well ID: 0384142907022
Loading map...
Location: 02/07-29-038-14W4/2
Location Alias: 02/07-29-38-14 W4M
Location Alias 2: 02/07-29-038-14 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 14
Section: 29
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 7-29-38-14
Operator Name: Karve Energy Inc.
License Number: 0274396
License Date: 2002-10-03
License Status: Amended
Spud Date: 2002-10-16
Final Drill Date: 2002-10-18
Well Total Depth: 1127.00 m
Surface Hole Latitude: 52.293287
Surface Hole Longitude: -111.964723

For data sources see[1][2]

Well History

Date Event
2002-10-03 Obtained License
2002-10-17 Surface Casing Operation Performed
2002-10-18 Finished Drilling
2002-10-18 Production Casing Operation Performed
2002-10-18 Well Mode changed to Drilled and Cased
2002-10-19 Rig Released
2002-10-19 Well Log Performed
2002-11-01 Well Log Performed
2002-11-02 Well Log Performed
2002-11-06 Perforation Treatment Performed - Jet Perforation
2002-11-26 Well Log Performed
2002-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-28 Plug Back Performed
2002-11-28 Well Log Performed
2002-11-29 Perforation Treatment Performed - Jet Perforation
2002-12-05 Well Log Performed
2002-12-06 Perforation Treatment Performed - Jet Perforation
2002-12-14 Perforation Treatment Performed - Cement Squeeze
2003-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-08 Perforation Treatment Performed - Jet Perforation
2003-01-08 Plug Back Performed
2003-01-08 Well Log Performed
2003-01-09 Perforation Treatment Performed - Jet Perforation
2003-01-14 Perforation Treatment Performed - Fractured
2003-05-30 Well Began Production
2003-05-30 Well Fluid changed to Gas
2003-05-30 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-11-06 Perforation 1084.00 1085.70 17
2003-01-09 Perforation 939.20 941.40 17
2003-01-14 Fracture 939.20 949.00 0
2002-11-28 Packing Device Capped w/Cement 1070.00 1073.00 0
2002-11-29 Perforation 1059.60 1061.60 17
2002-12-06 Perforation 1019.40 1021.70 17
2002-12-14 Cement Squeeze 1019.40 1061.60 0
2003-01-08 Packing Device Capped w/Cement 982.00 985.00 0
2003-01-08 Perforation 946.50 949.00 17
2003-01-09 Perforation 944.50 945.80 17
2003-01-09 Perforation 942.40 943.20 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 4968 0.0 0.0 0.0
2004 7421 0.0 0.0 0.0
2005 8636 0.0 0.0 0.0
2006 7063 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8609 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8674 0.0 0.0 0.0
2011 8286 0.0 0.0 0.0
2012 5222 0.0 0.0 0.0
2013 3807 0.0 0.0 0.0
2014 3864 0.0 0.0 0.0
2015 2621 0.0 0.0 0.0
2016 5541 0.0 0.0 0.0
2017 4700 0.0 0.0 0.0
2018 4624 0.0 0.0 0.0
2019 5136 0.0 0.0 0.0
2020 2040 0.0 0.0 0.0

For data sources see[5]

References