X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384152302000

Well Details

Well ID: 0384152302000
Loading map...
Location: 00/02-23-038-15W4/0
Location Alias: 00/02-23-38-15 W4M
Location Alias 2: 00/02-23-038-15 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 15
Section: 23
County/Municipality: County of Paintearth No. 18
Well Name: SENORA ET AL PROVOST 2-23-38-15
Operator Name: Senora Energy Corporation
License Number: 0098539
License Date: 1982-11-05
License Status: RecCertified
Spud Date: 1982-11-14
Final Drill Date: 1982-11-19
Well Total Depth: 1062.00 m
Surface Hole Latitude: 52.277016
Surface Hole Longitude: -112.036138

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-11-05 Obtained License
1982-11-16 Well Log Performed
1982-11-17 Drill Stem Test Performed
1982-11-19 Finished Drilling
1982-11-19 Well Log Performed
1982-11-19 Well Mode changed to Drilled and Cased
1982-11-20 Production Casing Operation Performed
1983-03-11 Well Began Production
1983-03-11 Well Fluid changed to Gas
1983-03-11 Well Mode changed to Flowing
1983-06-14 Perforation Treatment Performed - Jet Perforation
1989-09-07 Well Fluid changed to Gas
1989-09-07 Well Mode changed to Suspended
1990-05-25 Well Fluid changed to Gas
1990-05-25 Well Mode changed to Flowing
1992-10-23 Well Fluid changed to Gas
1992-10-23 Well Mode changed to Closed
1993-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-19 Perforation Treatment Performed - Jet Perforation
1993-11-19 Plug Back Performed
1993-11-19 Well Fluid changed to Gas
1993-11-19 Well Mode changed to Abandoned
1993-11-20 Perforation Treatment Performed - Remedial Casing
1994-05-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-06-14 Perforation 1002.00 1003.00 13
1993-11-19 Packing Device Capped w/Cement 740.00 1051.00 0
1993-11-19 Perforation 251.50 252.50 13
1993-11-20 Remedial Casing Cementing 251.50 252.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 5922 0.0 0.0 0.0
1984 4795 0.0 0.0 0.0
1985 4589 0.0 0.0 0.0
1986 2772 0.0 0.0 0.0
1988 2202 0.0 0.0 0.0
1989 4071 0.0 0.0 0.0
1990 4894 0.0 0.0 0.0
1991 6950 0.0 0.0 0.0
1992 2283 0.0 0.0 0.0

For data sources see[5]

References