X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384162512002

Well Details

Well ID: 0384162512002
Loading map...
Location: 00/12-25-038-16W4/2
Location Alias: 00/12-25-38-16 W4M
Location Alias 2: 00/12-25-038-16 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 16
Section: 25
County/Municipality: County of Paintearth No. 18
Well Name: MARL HALKIRK 12-25-38-16
Operator Name: Marlboro Energy Ltd.
License Number: 0140008
License Date: 1989-06-02
License Status: Issued
Spud Date: 1989-06-15
Final Drill Date: 1989-06-21
Well Total Depth: 1179.00 m
Surface Hole Latitude: 52.296503
Surface Hole Longitude: -112.166811

For data sources see[1][2]

Well History

Date Event
1989-06-02 Obtained License
1989-06-16 Surface Casing Operation Performed
1989-06-20 Drill Stem Test Performed
1989-06-21 Finished Drilling
1989-06-21 Well Log Performed
1989-06-21 Well Mode changed to Drilled and Cased
1989-06-22 Drill Stem Test Performed
1989-06-23 Production Casing Operation Performed
1989-06-23 Rig Released
1989-06-27 Perforation Treatment Performed - Jet Perforation
1989-06-27 Well Log Performed
1989-06-28 Perforation Treatment Performed - Fractured
1991-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-23 Perforation Treatment Performed - Jet Perforation
1993-10-23 Well Log Performed
1993-12-01 Well Began Production
1993-12-01 Well Fluid changed to Gas
1993-12-01 Well Mode changed to Flowing
1995-01-31 Well Fluid changed to Gas
1995-01-31 Well Mode changed to Suspended
2000-08-01 Well Fluid changed to Gas
2000-08-01 Well Mode changed to Flowing
2009-09-09 Well Fluid changed to Gas
2009-09-09 Well Mode changed to Suspended
2009-11-01 Well Fluid changed to Gas
2009-11-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-06-27 Perforation 1144.00 1146.00 7
1989-06-28 Fracture 1144.00 1146.00 0
1991-10-23 Packing Device Capped w/Cement 1127.00 1135.00 0
1991-10-23 Perforation 1013.00 1014.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 716 0.0 0.0 0.0
1994 2153 0.0 0.0 0.0
2000 3573 0.0 0.0 0.0
2001 8577 0.0 0.0 0.0
2002 8603 0.0 0.0 0.0
2003 8597 0.0 0.0 0.0
2004 8568 0.0 0.0 0.0
2005 8024 0.0 0.0 0.0
2006 8748 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8466 0.0 0.0 0.0
2009 7439 0.0 0.0 0.0
2010 8692 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8754 0.0 0.0 0.0
2014 8678 0.0 0.0 0.0
2015 4109 0.0 0.0 0.0
2016 3408 0.0 0.0 0.0
2017 6551 0.0 0.0 0.0
2018 1416 0.0 0.0 0.0
2019 1708 0.0 0.0 0.0
2020 1622 0.0 0.0 0.0

For data sources see[5]

References