X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384201606000

Well Details

Well ID: 0384201606000
Loading map...
Location: 00/06-16-038-20W4/0
Location Alias: 00/06-16-38-20 W4M
Location Alias 2: 00/06-16-038-20 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 20
Section: 16
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW ET AL STETTLER 6-16
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0008574
License Date: 1954-10-13
License Status: Issued
Spud Date: 1955-12-19
Final Drill Date: 1956-01-07
Well Total Depth: 1625.50 m
Surface Hole Latitude: 52.264997
Surface Hole Longitude: -112.804981

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-10-13 Obtained License
1956-01-05 Perforation Treatment Performed - Open-Hole Completion
1956-01-05 Production Casing Operation Performed
1956-01-07 Finished Drilling
1956-01-07 Well Mode changed to Drilled and Cased
1956-01-09 Well Began Production
1956-01-09 Well Fluid changed to Crude Oil
1956-01-09 Well Mode changed to Flowing
1964-06-11 Well Fluid changed to Crude Oil
1964-06-11 Well Mode changed to Pumping
1982-07-01 Perforation Treatment Performed - Cement Plug
1982-07-01 Perforation Treatment Performed - Jet Perforation
1982-07-01 Perforation Treatment Performed - Open-Hole Completion
1982-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-01 Well Fluid changed to Crude Oil
1986-01-01 Well Mode changed to Suspended
1989-01-01 Well Fluid changed to Crude Oil
1989-01-01 Well Mode changed to Pumping
1992-02-01 Well Fluid changed to Crude Oil
1992-02-01 Well Mode changed to Suspended
2006-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-05-16 Plug Back Performed
2006-05-17 Perforation Treatment Performed - Jet Perforation
2012-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-04-23 Plug Back Performed
2012-04-26 Liner Casing Operation Performed
2012-05-17 Perforation Treatment Performed - Jet Perforation
2012-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-01-05 Open Hole/Barefoot Completion 1622.10 1625.50 0
2012-05-17 Perforation 1404.50 1405.50 17
2012-05-17 Perforation 1397.00 1399.50 17
2012-11-28 Acid Treatment 1397.00 1411.50 0
1982-07-01 Cement Plug 1624.00 1625.50 0
1982-07-01 Open Hole/Barefoot Completion 1622.10 1624.00 0
1982-07-01 Perforation 1622.00 1623.60 13
1982-07-06 Acid Treatment 1622.00 1624.00 0
2006-05-15 Packing Device Capped w/Cement 1597.00 1605.00 0
2006-05-17 Perforation 1586.10 1588.00 13
2012-04-23 Packing Device Capped w/Cement 1561.00 1584.70 0
2012-05-17 Perforation 1410.00 1411.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1979 3161 0.0 0.0 0.0
1980 7290 0.0 0.0 0.0
1981 582 0.0 0.0 0.0
1982 3762 0.0 0.0 0.0
1983 6539 0.0 0.0 0.0
1989 4426 0.0 0.0 0.0
1990 2592 0.0 0.0 0.0
1991 8176 0.0 0.0 0.0
1992 672 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-26 No Incident Encountered 0.00 0.00
2012-05-17 No Incident Encountered 0.00 0.00
2012-11-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References