X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384202904033

Well Details

Well ID: 0384202904033
Loading map...
Location: 03/04-29-038-20W4/3
Location Alias: 03/04-29-38-20 W4M
Location Alias 2: 03/04-29-038-20 W4/03
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 20
Section: 29
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW 103 STETTLER 4-29-38-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0334174
License Date: 2005-07-07
License Status: Issued
Spud Date: 2005-07-23
Final Drill Date: 2005-07-24
Well Total Depth: 646.00 m
Surface Hole Latitude: 52.292247
Surface Hole Longitude: -112.833712

For data sources see[1][2]

Well History

Date Event
2005-07-07 Obtained License
2005-07-23 Surface Casing Operation Performed
2005-07-24 Finished Drilling
2005-07-24 Production Casing Operation Performed
2005-07-24 Well Mode changed to Drilled and Cased
2005-07-25 Rig Released
2005-08-14 Well Log Performed
2005-09-20 Perforation Treatment Performed - Jet Perforation
2005-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-04 Perforation Treatment Performed - Jet Perforation
2005-10-04 Plug Back Performed
2005-11-26 Perforation Treatment Performed - Jet Perforation
2005-11-27 Perforation Treatment Performed - Jet Perforation
2005-12-18 Perforation Treatment Performed - Fractured
2018-04-01 Well Began Production
2018-04-01 Well Fluid changed to Coalbed Methane-Coals and Other
2018-04-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-20 Perforation 626.50 630.50 17
2005-11-26 Perforation 258.90 259.70 17
2005-11-26 Perforation 255.30 255.70 17
2005-11-26 Perforation 245.90 246.30 17
2005-11-26 Perforation 242.20 243.50 17
2005-11-27 Perforation 240.00 241.80 17
2005-11-27 Perforation 238.10 238.40 17
2005-11-27 Perforation 231.80 232.80 17
2005-11-27 Perforation 228.20 229.20 17
2005-11-27 Perforation 223.80 224.80 17
2005-11-27 Perforation 182.10 182.50 17
2005-10-04 Packing Device Capped w/Cement 617.00 625.00 0
2005-11-27 Perforation 168.00 168.60 17
2005-11-27 Perforation 166.70 167.30 17
2005-12-18 Fracture 371.50 387.00 0
2005-12-18 Fracture 166.70 312.90 0
2005-10-04 Perforation 382.50 387.00 17
2005-10-04 Perforation 371.50 373.50 17
2005-11-26 Perforation 311.90 312.90 17
2005-11-26 Perforation 308.00 308.30 17
2005-11-26 Perforation 270.00 273.00 17
2005-11-26 Perforation 266.60 267.20 17
2005-11-26 Perforation 260.40 260.80 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2389 0.0 0.0 0.0
2019 5265 0.0 0.0 0.0
2020 2096 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References