X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384223204002

Well Details

Well ID: 0384223204002
Loading map...
Location: 00/04-32-038-22W4/2
Location Alias: 00/04-32-38-22 W4M
Location Alias 2: 00/04-32-038-22 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 22
Section: 32
County/Municipality: Red Deer County
Well Name: CNRL UNIT NEVIS 4-32-38-22
Operator Name: Canadian Natural Resources Limited
License Number: 0004130
License Date: 1952-01-24
License Status: RecCertified
Spud Date: 1952-01-26
Final Drill Date: 1952-04-08
Well Total Depth: 2057.40 m
Surface Hole Latitude: 52.304915
Surface Hole Longitude: -113.120924

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-01-24 Obtained License
1952-02-27 Drill Stem Test Performed
1952-02-28 Drill Stem Test Performed
1952-02-29 Drill Stem Test Performed
1952-03-03 Drill Stem Test Performed
1952-03-06 Liner Casing Operation Performed
1952-03-10 Drill Stem Test Performed
1952-03-11 Drill Stem Test Performed
1952-03-12 Drill Stem Test Performed
1952-03-13 Drill Stem Test Performed
1952-03-14 Drill Stem Test Performed
1952-03-15 Drill Stem Test Performed
1952-03-16 Drill Stem Test Performed
1952-03-17 Drill Stem Test Performed
1952-03-18 Drill Stem Test Performed
1952-03-30 Drill Stem Test Performed
1952-03-31 Drill Stem Test Performed
1952-04-08 Drill Stem Test Performed
1952-04-08 Finished Drilling
1952-04-08 Well Mode changed to Drilled and Cased
1952-04-16 Perforation Treatment Performed - Jet Perforation
1964-06-20 Perforation Treatment Performed - Cement Squeeze
1964-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-22 Perforation Treatment Performed - Bullet Perforation
1976-04-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-06-18 Well Log Performed
1979-10-16 Perforation Treatment Performed - Cement Plug
1979-10-17 Perforation Treatment Performed - Cement Plug
1979-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-19 Perforation Treatment Performed - Jet Perforation
1979-11-13 Perforation Treatment Performed - Cement Plug
1979-11-13 Perforation Treatment Performed - Jet Perforation
1980-01-18 Perforation Treatment Performed - Jet Perforation
1980-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-15 Perforation Treatment Performed - Jet Perforation
1987-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-04-10 Plug Back Performed
1987-04-10 Well Log Performed
1987-04-16 Perforation Treatment Performed - Jet Perforation
1987-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-01 Well Began Production
1987-05-01 Well Fluid changed to Crude Oil
1987-05-01 Well Mode changed to Pumping
1987-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-10 Well Fluid changed to Crude Oil
1988-04-10 Well Mode changed to Pumping
1989-09-01 Well Fluid changed to Crude Oil
1989-09-01 Well Mode changed to Suspended
1993-02-10 Well Log Performed
1993-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-02-11 Plug Back Performed
1993-02-11 Well Fluid changed to Crude Oil
1993-02-11 Well Log Performed
1993-02-11 Well Mode changed to Abandoned Zone
1993-02-12 Perforation Treatment Performed - Jet Perforation
1993-07-26 Well Log Performed
1993-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-29 Perforation Treatment Performed - Cement Squeeze
1993-08-03 Well Log Performed
1993-08-04 Perforation Treatment Performed - Jet Perforation
1993-11-03 Well Log Performed
1993-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-04 Plug Back Performed
1993-11-04 Well Log Performed
1993-11-05 Perforation Treatment Performed - Jet Perforation
1994-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-04 Perforation Treatment Performed - Jet Perforation
1994-02-04 Perforation Treatment Performed - Remedial Casing
1994-02-04 Plug Back Performed
1994-02-04 Well Log Performed
1994-04-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-16 Perforation 1716.00 1716.60 13
1979-10-17 Cement Plug 1697.20 1699.10 0
1979-10-19 Perforation 1691.60 1696.80 13
1979-10-19 Acid Treatment 1691.60 1696.80 0
1979-11-13 Cement Plug 1692.40 1697.20 0
1979-11-13 Perforation 1691.60 1695.10 13
1980-01-18 Perforation 1690.40 1692.40 13
1980-02-19 Acid Treatment 1690.40 1695.10 0
1987-01-15 Perforation 1512.50 1521.50 13
1987-04-10 Packing Device Capped w/Cement 1657.10 1670.30 0
1987-04-16 Perforation 1519.50 1520.50 13
1964-06-20 Cement Squeeze 1716.00 1716.60 0
1987-04-17 Acid Treatment 1512.50 1521.50 0
1987-05-21 Acid Treatment 1512.50 1521.50 0
1993-02-11 Packing Device Capped w/Cement 1496.00 1505.00 0
1993-02-12 Perforation 1469.00 1471.00 14
1993-07-27 Acid Treatment 1469.00 1471.00 0
1993-07-29 Cement Squeeze 1469.00 1471.00 0
1993-08-04 Perforation 1469.00 1470.00 13
1993-11-04 Packing Device Capped w/Cement 1457.00 1465.00 0
1993-11-05 Perforation 1402.50 1404.50 13
1994-02-04 Packing Device Capped w/Cement 1392.00 1401.00 0
1964-06-22 Bullet Perforation 1710.50 1711.80 3
1994-02-04 Perforation 500.00 501.00 13
1994-02-04 Remedial Casing Cementing 500.00 501.00 0
1964-06-22 Bullet Perforation 1707.80 1709.60 3
1964-06-22 Bullet Perforation 1704.70 1705.70 3
1964-06-22 Bullet Perforation 1698.70 1701.40 3
1964-06-22 Acid Treatment 1698.70 1711.80 0
1976-04-29 Packing Device Capped w/Cement 1701.40 1704.40 0
1979-10-16 Cement Plug 1699.10 1701.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 5045 0.0 0.0 0.0
1988 5013 0.0 0.0 0.0
1989 3970 0.0 0.0 0.0

For data sources see[5]

References