X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384233513000

Well Details

Well ID: 0384233513000
Loading map...
Location: 00/13-35-038-23W4/0
Location Alias: 00/13-35-38-23 W4M
Location Alias 2: 00/13-35-038-23 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 23
Section: 35
County/Municipality: Red Deer County
Well Name: VERMILION RES NEVIS 13-35-38-23
Operator Name: Vermilion Energy Inc.
License Number: 0210105
License Date: 1997-12-10
License Status: Abandoned
Spud Date: 1997-12-13
Final Drill Date: 1997-12-25
Well Total Depth: 1755.00 m
Surface Hole Latitude: 52.314721
Surface Hole Longitude: -113.188870

For data sources see[1][2]

Well History

Date Event
1997-12-10 Obtained License
1997-12-14 Surface Casing Operation Performed
1997-12-17 Direction Drilling Operation Performed - Horizontal
1997-12-21 Production Casing Operation Performed
1997-12-25 Finished Drilling
1997-12-25 Well Mode changed to Drilled and Cased
1997-12-27 Perforation Treatment Performed - Open-Hole Completion
1997-12-27 Rig Released
1998-01-02 Well Log Performed
1998-01-04 Well Log Performed
1998-01-31 Well Began Production
1998-01-31 Well Fluid changed to Crude Oil
1998-01-31 Well Mode changed to Pumping
1998-11-01 Well Fluid changed to Crude Oil
1998-11-01 Well Mode changed to Suspended
1999-06-28 Perforation Treatment Performed - Cement Squeeze
1999-06-28 Well Fluid changed to Crude Oil
1999-06-28 Well Mode changed to Abandoned Zone
1999-12-12 Perforation Treatment Performed - Jet Perforation
1999-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-13 Perforation Treatment Performed - Remedial Casing
1999-12-14 Well Abandoned
1999-12-14 Well Fluid changed to Crude Oil
1999-12-14 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-12-17 1265.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-12-27 Open Hole/Barefoot Completion 1531.00 1755.00 0
1999-06-28 Cement Squeeze 1531.00 1755.00 0
1999-12-12 Perforation 290.00 291.00 17
1999-12-13 Remedial Casing Cementing 290.00 291.00 0
1999-12-13 Packing Device Capped w/Cement 267.30 282.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 400 0.0 0.0 0.0

For data sources see[6]

References