X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384261604020

Well Details

Well ID: 0384261604020
Loading map...
Location: 02/04-16-038-26W4/0
Location Alias: 02/04-16-38-26 W4M
Location Alias 2: 02/04-16-038-26 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 26
Section: 16
County/Municipality: Red Deer County
Well Name: SRI ERL 102 JOFFRE 4-16-38-26
Operator Name: Gain Energy Ltd.
License Number: 0169762
License Date: 1994-08-22
License Status: Re-Entered
Spud Date: 1994-12-14
Final Drill Date: 1994-12-21
Well Total Depth: 1946.00 m
Surface Hole Latitude: 52.262518
Surface Hole Longitude: -113.665944

For data sources see[1][2]

Well History

Date Event
1994-08-22 Obtained License
1994-12-15 Surface Casing Operation Performed
1994-12-21 Drill Stem Test Performed
1994-12-21 Finished Drilling
1994-12-21 Well Log Performed
1994-12-21 Well Mode changed to Drilled and Cased
1994-12-23 Production Casing Operation Performed
1994-12-23 Rig Released
1995-03-03 Well Log Performed
1995-03-04 Perforation Treatment Performed - Jet Perforation
1995-03-04 Well Log Performed
1995-03-06 Perforation Treatment Performed - Fractured
1995-05-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-05-13 Plug Back Performed
1995-05-24 Perforation Treatment Performed - Jet Perforation
1995-05-25 Perforation Treatment Performed - Fractured
1995-12-22 Well Began Production
1995-12-22 Well Fluid changed to Crude Oil
1995-12-22 Well Mode changed to Flowing
1996-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-19 Plug Back Performed
1996-06-19 Well Abandoned
1996-06-19 Well Fluid changed to Crude Oil
1996-06-19 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-03-04 Perforation 1868.00 1872.00 13
1995-03-06 Fracture 1868.00 1872.00 0
1995-05-13 Packing Device Capped w/Cement 1857.00 1865.00 0
1995-05-24 Perforation 1844.00 1848.00 14
1995-05-25 Fracture 1844.00 1848.00 0
1996-06-19 Packing Device Capped w/Cement 1822.00 1830.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 204 0.0 0.0 0.0
1996 1910 0.0 0.0 0.0

For data sources see[5]

References