X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384273610000

Well Details

Well ID: 0384273610000
Loading map...
Location: 00/10-36-038-27W4/0
Location Alias: 00/10-36-38-27 W4M
Location Alias 2: 00/10-36-038-27 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 27
Section: 36
County/Municipality: Red Deer County
Well Name: NALR D2AUNIT JOFFRE 10-36-38-27
Operator Name: NAL Resources Limited
License Number: 0014509
License Date: 1957-12-31
License Status: RecCertified
Spud Date: 1958-03-27
Final Drill Date: 1958-04-29
Well Total Depth: 2182.70 m
Surface Hole Latitude: 52.311860
Surface Hole Longitude: -113.728178

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-12-31 Obtained License
1958-04-29 Finished Drilling
1958-04-29 Well Mode changed to Drilled and Cased
1958-04-30 Perforation Treatment Performed - Open-Hole Completion
1958-04-30 Production Casing Operation Performed
1958-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-10 Well Began Production
1958-05-10 Well Fluid changed to Crude Oil
1958-05-10 Well Mode changed to Flowing
1972-11-06 Well Fluid changed to Crude Oil
1972-11-06 Well Mode changed to Pumping
1980-04-15 Perforation Treatment Performed - Chemical Squeeze
1983-12-01 Well Fluid changed to Crude Oil
1983-12-01 Well Mode changed to Suspended
1992-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-30 Perforation Treatment Performed - Jet Perforation
1992-06-30 Perforation Treatment Performed - Remedial Casing
1992-06-30 Plug Back Performed
1992-06-30 Well Fluid changed to Crude Oil
1992-06-30 Well Log Performed
1992-06-30 Well Mode changed to Abandoned
1992-09-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-04-30 Open Hole/Barefoot Completion 2151.90 2182.70 0
1958-05-09 Acid Treatment 2151.90 2182.70 0
1980-04-15 Chemical Squeeze 2151.90 2182.70 0
1992-06-30 Packing Device Capped w/Cement 2133.50 2141.00 0
1992-06-30 Perforation 283.00 283.50 13
1992-06-30 Remedial Casing Cementing 283.00 283.50 0
1992-06-30 Packing Device Capped w/Cement 265.50 283.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2168 0.0 0.0 0.0
1968 2274 0.0 0.0 0.0
1969 3202 0.0 0.0 0.0
1970 7552 0.0 0.0 0.0
1971 8469 0.0 0.0 0.0
1972 7538 0.0 0.0 0.0
1973 6913 0.0 0.0 0.0
1974 6431 0.0 0.0 0.0
1975 7523 0.0 0.0 0.0
1976 8132 0.0 0.0 0.0
1977 8435 0.0 0.0 0.0
1978 8236 0.0 0.0 0.0
1979 8302 0.0 0.0 0.0
1980 7716 0.0 0.0 0.0
1981 5444 0.0 0.0 0.0
1982 4692 0.0 0.0 0.0
1983 4199 0.0 0.0 0.0

For data sources see[5]

References